Permit

New Residential Construction

555 SW ROLLING MEADOWS GLN
FORT WHITE, FL 32038

Permit #
000050420
Application #
64734
Status Completed
  1. Submitted Apr 16, 2024
  2. Issued Jul 23, 2024
  3. Expires Oct 13, 2026
  4. Completed Apr 17, 2026

Property

Parcel #
03767-401
Owner
Tuya Betty, Velo Iliana Maria Tuya, Velo Andres
Acres
5.02
Subdivision
Sedgefield Phase 4
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0390C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
2
Heated Area (Sqft)
2988
Total Area (Sqft)
3872
Building Height
31
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0515
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Plan Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Documents Required
  8. Final Review - Documents Required
  9. Final Review - Documents Required
  10. Final Review - Documents Required
  11. Final Review - Documents Required
  12. Final Review - Documents Required
  13. Final Review - Payment Needed
  14. Permit Issued

Contractors

This is an owner-builder project.

Inspections

  1. Aug 20, 2024

    Passed: Engineering - Setbacks

    Appears With Setbacks On Site Plan

    Inspected by Gary Pitzer

  2. Aug 20, 2024

    Passed: Building - Footer

    2 #5 Rebar With Uprights For Stem Walls, All Wired

    Inspected by Gary Pitzer

  3. Sep 24, 2024

    Passed: Electrical - 1st Underground Rough–In

    Under Slab Conduits

    Inspected by Gary Pitzer

  4. Sep 24, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dwv Only, No Clean Out On Exterior

    Inspected by Gary Pitzer

  5. Oct 1, 2024

    Failed: Building - Slab

    Slab Not Ready For Inspection

    Inspected by Gary Pitzer

  6. Oct 2, 2024

    Passed: Building - Slab

    Perimeter Steel Wired, Plastic Taped, Contractor Using Fiber Crete, I Asked For Copies Of Load Tickets

    Inspected by Gary Pitzer

  7. Nov 7, 2024

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  8. Dec 4, 2024

    Passed: Building - Roof Decking

    Partial Is Second Floor Area, Lower Roof Remains Not Completd

    Inspected by Gary Pitzer

  9. Dec 20, 2024

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  10. Jan 7, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  11. Apr 9, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  12. Apr 9, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  13. Apr 9, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  14. May 23, 2025

    Passed: Building - Insulation

    Inspected by All Batts, Walls And Ceilings

  15. Aug 5, 2025

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Matt Forsyth

  16. Aug 14, 2025

    Release to power company

    Rec'd Septic - Ew

    Inspected by Ewilliams

  17. Aug 14, 2025

    Septic Release Inspection

    Inspected by Health Dept

  18. Feb 3, 2026

    Passed: Building - Spot Check

    Inspected by Troy Crews

  19. Apr 16, 2026

    Passed: Building - Final

    Inspected by Gary Pitzer