Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Storage Building Permit

Address 1130 SW BLUFF DR
FORT WHITE, FL 32038
Parcel #: 04236-047
Acres: 1.64
Owner: Depree Warren
Subdivision: Cedar Spring Shores
Zoning: ESA-2
Flood Zone: AE
District: 2
Application #: 65308
Permit #: 000050414
Related Permit: Right-of-Way Access/Driveway: 000050200
Submitted: Thursday, May 23, 2024
Issued: Monday, July 22, 2024
Expires: Sunday, January 19, 2025
Completed:
Status: Point Review - Reviewed
Septic Release? Yes
Notes:
V0339-- VARIANCE APPROVED 12' SIDE SETBACKS ZONING: BFE OF 35FT. DFE OF 36FT. *ELECTRIC SHALL BE WATERPROOFED TO DFE. *ENGINEERED OR NON-ENGINEERED FLOOD OPENINGS MUST BE NOTED ON THE BUILDING PLANS WITH LOCATION AND SIZE/FLOW CALCULATIONS AND LOCATION NO HIGHER THAT 12" ABOVE ADJACENT FINISHED GRADE. IF USING ENGINEERED VENTS, PROVIDE INFORMATION OF VENTS. *FINAL ELEVATION CERTIFICATE REQUIRED PRIOR TO FINAL INSPECTION.
Job Details
Finished floor requirement
Fema map number 12023C0313D
This is the construction of a SFD/UTILITY
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Stories 1
Heated Area (Sqft) 2321.00
Total Area (Sqft) 4267.00
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 19-0080
Review Notes
5/13/2024 Application pending.
5/23/2024 Application submitted by applicant.
5/23/2024 Point Review - Printed-Online Application
5/23/2024 Point Review - Reviewed
5/24/2024 Zoning Review - Reviewed
5/28/2024 Plan Review - Documents Required
5/31/2024 Zoning Review - Reviewed
6/3/2024 Plan Review - On Hold-Incomplete
6/11/2024 Plan Review - On Hold-Incomplete
6/18/2024 Plan Review - On Hold-Incomplete
6/24/2024 Plan Review - On Hold-Incomplete
7/1/2024 Plan Review - On Hold-Incomplete
7/9/2024 Plan Review - On Hold-Incomplete
7/15/2024 Plan Review - Reviewed
7/22/2024 Plan Review - Documents Required
7/22/2024 Plan Review - Reviewed
7/22/2024 Final Review - Processing
7/22/2024 Final Review - Payment Needed
7/22/2024 Permit Issued
1/9/2025 Point Review - Reviewed
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Building - Slab Anthony Aslan 7/23/2024
Septic Release Inspection Health Dept 7/23/2024
Documents
File Name Date File Size