Roof Replacement or Repair
Permit
| Application #: | 64753 |
| Permit #: |
000050375 |
| Related Permit: |
|
| Submitted: | Tuesday, July 16, 2024 |
| Issued: | Wednesday, July 17, 2024 |
| Expires: | Friday, September 6, 2024 |
| Completed: | Friday, September 6, 2024 |
| Status: |
Completed |
| Septic Release? |
N/A |
Notes
PICS AND AFFIDAVIT REC'D
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0280D |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Crown Tile, Batten system, TU Max underlayment |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
0.00 |
| No. of Stories |
2 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Concrete |
| Florida Product Approval Number |
FL16729-R5 |
| Product Manufacturer |
Crown |
| Product Description |
Tile |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof. |
| Sealed roof decking explanation for other option. |
TU Max underlayment |
| Ventilation: |
Off-ridge Vent |
| Flashing: |
Repair Existing |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Second Roof Pitch (if applicable) |
2:12 to 4:12 |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 4/1/2024 |
Application pending. |
| 7/16/2024 |
Application submitted by applicant. |
| 7/16/2024 |
Final Review - Payment Needed |
| 7/17/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Chase Massey Massey Roofing Services Llc
Workers Comp Expired. |
CCC1332486 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
Removing Barrel Tile Roof Installing Slate Tiles, Peal And Stick Underlayment Onsite. |
Troy Crews |
8/21/2024 |
| Passed: Re-Roof - Final |
|
Troy Crews |
9/6/2024 |