Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 223 NW WHITTON CT
LAKE CITY, FL 32055
Parcel #: 02202-124
Acres: 1.94
Owner: Lay Willis Bryce, Lay Jenna
Subdivision: High Pointe
Zoning: PRRD
Flood Zone: X
District: 3
Application #: 65164
Permit #: 000050326
Related Permit: Right-of-Way Access/Driveway: 000049924
Submitted: Thursday, May 2, 2024
Issued: Thursday, July 11, 2024
Expires: Thursday, May 15, 2025
Completed: Thursday, May 15, 2025
Status: Completed
Septic Release? Yes
Notes:
*MFE= 1' ABOVE THE ROAD
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0280D
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1.5
Heated Area (Sqft) 3046
Total Area (Sqft) 4298
Building Height 22
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 24-0450
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Service Amps 200
Review Notes
5/2/2024 Application pending.
5/2/2024 Application submitted by applicant.
5/14/2024 Point Review - Printed-Online Application
5/15/2024 Zoning Review - Reviewed
5/17/2024 Plan Review - Plumbing Approved
5/17/2024 Plan Review - Mechanical Approved
5/17/2024 Plan Review - Electrical Approved
5/17/2024 Plan Review - Building Approved
5/17/2024 Plan Review - Reviewed
5/17/2024 Final Review - Documents Required
5/23/2024 Final Review - Documents Required
5/28/2024 Final Review - Documents Required
6/5/2024 Final Review - Documents Required
6/10/2024 Final Review - Documents Required
6/12/2024 Final Review - Documents Required
6/17/2024 Final Review - Documents Required
6/25/2024 Final Review - Documents Required
7/1/2024 Final Review - Documents Required
7/2/2024 Final Review - Documents Required
7/9/2024 Final Review - Documents Required
7/9/2024 Final Review - Reviewed
7/9/2024 Final Review - Payment Needed
7/11/2024 Permit Issued
5/13/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Matthew Hentzelman
Trademark Construction Group Inc.
County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CGC1514780 General Contractor Contractor
Roger Whiddon
Lake City Plumbing Inc
CFC1428686 Cert Plumbing Subcontractor
Michael Towne
Muncy Contracting Llc
Workers Comp & Employees Workers Comp Expired.
CCC1330125 Cert. Roofing Subcontractor
David P Wood
Woods Electrical Services Inc
EC13002213 Electrical Contractor Subcontractor
David E Hall
David Hall's Air Cond & Heating Svc,inc.
CAC057424 Class B A/c Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Footing Needs To Dry Out Matt Forsyth 7/31/2024
Passed: Engineering - Setbacks Matt Forsyth 7/31/2024
Passed: Plumbing/Gas - 1st Underground Rough–In Water Supply Under Slab Under Pressure Matt Forsyth 8/23/2024
Electrical -Temporary Service Matt Forsyth 9/18/2024
Passed: Building - Slab Matt Forsyth 9/18/2024
Passed: Electrical - Temporary Service Waiting For Pictures Of Romex Removed From Panel Hanging Out Matt Forsyth 9/18/2024
Passed: Building - Roof Decking Matt Forsyth 10/29/2024
Passed: Building - Wall Sheathing Matt Forsyth 10/29/2024
Passed: Electrical - 2nd Rough-In Matt Forsyth 1/13/2025
Passed: Mechanical - Rough In Matt Forsyth 1/13/2025
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 1/13/2025
Passed: Building - Framing Garage Door And One Window Will Complete The Envelope Matt Forsyth 1/14/2025
Passed: Building - Insulation Spray Foam Attic Later Date Matt Forsyth 1/21/2025
Septic Release Inspection Health Dept 3/14/2025
Passed: Electrical - Permanent Power Matt Forsyth 3/20/2025
Release to power company Driveway Final Required Prior To Release Of Power To Fpl-- 3.28.25 (rec'd) Matt Forsyth 3/21/2025
Submitted Power Release through FPL Portal Garber, Melissa 4/1/2025
Passed: Building - Final Documents Pending Matt Forsyth 5/14/2025
Certificate-Release Certificate Rec'd Blower Door And Termite Matt Forsyth 5/15/2025