| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
|
Matt Forsyth |
7/17/2024 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
7/17/2024 |
| Cancelled: Building - Footer |
|
Troy Crews |
7/17/2024 |
| Cancelled: Engineering - Setbacks |
|
Troy Crews |
7/17/2024 |
| Cancelled: Building - Framing |
|
Gary Pitzer |
7/18/2024 |
| Cancelled: Electrical - 2nd Rough-In |
|
Gary Pitzer |
7/18/2024 |
| Cancelled: Mechanical - Rough In |
|
Gary Pitzer |
7/18/2024 |
| Cancelled: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
7/18/2024 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Dwv And Water |
Gary Pitzer |
8/8/2024 |
| Failed: Building - Slab |
Hook Bar Into Slab Not Chaired Up Perimeter Bar Not Chaired Up Properly |
Matt Forsyth |
8/12/2024 |
| Passed: Building - Slab |
Placement Of Rebar Corrected |
Matt Forsyth |
8/12/2024 |
| Passed: Building - Wall Sheathing |
Structural Panel Top Plate Bottom Plate |
Matt Forsyth |
8/27/2024 |
| Passed: Electrical - Temporary Service |
|
Matt Forsyth |
9/25/2024 |
| Release to power company |
|
Matt Forsyth |
9/25/2024 |
| Failed: Building - Framing |
Fasteners Used For The Hold Down Brackets In Garage Portal Wrong Size Nails Used Also 3 Inch Nails Minimum Of Truss Brackets(hangers) |
Matt Forsyth |
10/29/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
10/29/2024 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
10/29/2024 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
10/29/2024 |
| Passed: Building - Framing |
!?? |
Matt Forsyth |
11/4/2024 |
| Cancelled: Building - Insulation |
|
Matt Forsyth |
11/4/2024 |
| Passed: Building - Insulation |
Walls Only |
Matt Forsyth |
11/6/2024 |
| Passed: Electrical - Permanent Power |
Septic Needed |
Matt Forsyth |
1/29/2025 |
| Release to power company |
Septic Rec'd |
Melissa Garber |
2/13/2025 |
| Septic Release Inspection |
|
Health Dept |
2/13/2025 |
| Cancelled: Building - Final |
|
Emaleigh Williams |
3/5/2025 |
| Passed: Building - Final |
|
Troy Crews |
3/7/2025 |