Permit Details

Permit Search

Permit

Mobile Home

1300 SW BARON GLN
FORT WHITE, FL 32038

Permit #
000050269
Application #
65926
Status Completed
  1. Submitted Jun 19, 2024
  2. Issued Jul 2, 2024
  3. Expires Mar 22, 2025
  4. Completed Sep 23, 2024

Property

Parcel #
03752-421
Owner
Walstrom Kevin J, Walstrom Melanie E
Acres
4.70
Subdivision
Southern Meadows Phase 3
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
85.5'
Requirement needed
By Final Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0390C
Mobile Home is a:
Double Wide
Year Built
2025
Width (Ft.In)
32
Length (Ft.In)
56
Driveway access to home:
Existing Drive
Installation Decal #
108054
Special temporary use permit number:
STU240610
Septic #
23-0609
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
DES290GA2413718AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Reviewed
  4. Zoning Review - Reviewed
  5. Plan Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Documents Required
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • Kyle Johnson

    Florida Mfg Foundations Llc

    License
    IH1126657
    Title
    Mh (dih) Dealer/installer
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Sep 10, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Sep 23, 2024

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Gary Pitzer

  3. Sep 23, 2024

    Release to power company

    Inspected by Gary Pitzer

  4. Sep 23, 2024

    Passed: Engineering - Setbacks

    Appears To Be Within Setbacks Per Site Plan, No Markers Visible

    Inspected by Gary Pitzer