| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
|
Matt Forsyth |
7/10/2024 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
7/10/2024 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
7/29/2024 |
| Cancelled: Building - Slab |
|
Troy Crews |
8/6/2024 |
| Passed: Building - Slab |
Tie All Rebar Around Perimeter Up Off Block Two Spots Need To Be Cleaned Out Before Pouring Concrete |
Matt Forsyth |
8/6/2024 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
9/4/2024 |
| Passed: Building - Wall Sheathing |
|
Matt Forsyth |
9/4/2024 |
| Cancelled: Building - Strapping |
|
Troy Crews |
9/9/2024 |
| Cancelled: Building - Framing |
|
Troy Crews |
9/9/2024 |
| Passed: Building - Framing |
Need Attic Access |
Matt Forsyth |
9/9/2024 |
| Passed: Building - Strapping |
|
Matt Forsyth |
9/9/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
10/9/2024 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
10/9/2024 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
10/9/2024 |
| Rescheduled 10/11/2024:Electrical - Temporary Service |
|
Troy Crews |
10/11/2024 |
| Passed: Electrical - Temporary Service |
|
Matt Forsyth |
10/11/2024 |
| Release to power company |
|
Matt Forsyth |
10/11/2024 |
| Passed: Building - Insulation |
Fresh Air For Fireplace Needs To Be Addressed |
Matt Forsyth |
12/3/2024 |
| Septic Release Inspection |
|
Health Dept |
12/12/2024 |
| Passed: Electrical - Permanent Power |
|
Matt Forsyth |
2/26/2025 |
| Release to power company |
|
Matt Forsyth |
2/26/2025 |
| Submitted Power Release through FPL Portal |
|
Weaver, Patrick G. |
2/28/2025 |
| Certificate-Release Certificate |
|
Troy Crews |
4/16/2025 |
| Passed: Building - Final |
Need To Load In Pictures Of Floor Elevation And Blower Door Incomplete Checklist |
Troy Crews |
4/16/2025 |