Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Modular Building - Residential or Commercial Permit
Address 702 NE OKINAWA ST
LAKE CITY, FL 32055
Parcel #: 07253-000
Acres: 34.69
Owner: Robbins Real Estate Inc
Subdivision:
Zoning: I
Flood Zone: X
District: 1
Application #: 65056
Permit #: 000050264
Related Permit: Right-of-Way Access/Driveway: 000049870
Submitted: Thursday, April 25, 2024
Issued: Tuesday, July 2, 2024
Expires: Thursday, August 22, 2024
Completed: Thursday, August 22, 2024
Status: Completed
Septic Release? Yes
Notes:
*MFE= 1' ABOVE THE ROAD REPLACING EXISTING OFFICE TRAILER
Job Details
Modular frame type On frame
Use Type: Commercial
Heated Area (Sqft) 2100
Total Area (Sqft) 2100
Stories 1
Building Height 10
Service Amps 200
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Business
Setbacks Front 20'
Setback Side 1 15'
Setback Side 2 15'
Setbacks Rear 15'
Septic# (00-0000) or (X00-000) 24-0439
Dev Permit # F023-
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0305D
Review Notes
4/25/2024 City of Lake City Utilities Notified. City of Lake City Notified of Application within Utility Service Areas LC_GAS,.
4/25/2024 Point Review - Reviewed NEEDED * OWNERS SIGNATURE ON OWNER AND CONTRACTOR SIGNATURE PAGE * PLUMBING SUB FORM WILL NEED TO BE SIGNED
4/25/2024 Zoning Review - Reviewed NEEDED * OWNERS SIGNATURE ON OWNER AND CONTRACTOR SIGNATURE PAGE * PLUMBING SUB FORM WILL NEED TO BE SIGNED ZONING: *MFE= 1' ABOVE THE ROAD SITE PLAN APPROVED UNDER SONING PERMIT #SDP240203
5/2/2024 Plan Review - Plumbing Approved NEEDED * OWNERS SIGNATURE ON OWNER AND CONTRACTOR SIGNATURE PAGE * PLUMBING SUB FORM WILL NEED TO BE SIGNED ZONING: *MFE= 1' ABOVE THE ROAD SITE PLAN APPROVED UNDER ZONING PERMIT #SDP240203
5/2/2024 Plan Review - Mechanical Approved NEEDED * OWNERS SIGNATURE ON OWNER AND CONTRACTOR SIGNATURE PAGE * PLUMBING SUB FORM WILL NEED TO BE SIGNED ZONING: *MFE= 1' ABOVE THE ROAD SITE PLAN APPROVED UNDER ZONING PERMIT #SDP240203
5/2/2024 Plan Review - Electrical Approved NEEDED * OWNERS SIGNATURE ON OWNER AND CONTRACTOR SIGNATURE PAGE * PLUMBING SUB FORM WILL NEED TO BE SIGNED ZONING: *MFE= 1' ABOVE THE ROAD SITE PLAN APPROVED UNDER ZONING PERMIT #SDP240203
5/2/2024 Plan Review - Building Approved NEEDED * OWNERS SIGNATURE ON OWNER AND CONTRACTOR SIGNATURE PAGE * PLUMBING SUB FORM WILL NEED TO BE SIGNED ZONING: *MFE= 1' ABOVE THE ROAD SITE PLAN APPROVED UNDER ZONING PERMIT #SDP240203
5/2/2024 Plan Review - Reviewed NEEDED * OWNERS SIGNATURE ON OWNER AND CONTRACTOR SIGNATURE PAGE * PLUMBING SUB FORM WILL NEED TO BE SIGNED ZONING: *MFE= 1' ABOVE THE ROAD SITE PLAN APPROVED UNDER ZONING PERMIT #SDP240203
5/2/2024 Final Review - Documents Required NEEDED * OWNERS SIGNATURE ON OWNER AND CONTRACTOR SIGNATURE PAGE * PLUMBING SUB FORM WILL NEED TO BE SIGNED ZONING: *MFE= 1' ABOVE THE ROAD SITE PLAN APPROVED UNDER ZONING PERMIT #SDP240203
5/20/2024 Final Review - Corrections Needed NEEDED * ESTIMATED COST OF CONSTRUCTION ZONING: *MFE= 1' ABOVE THE ROAD SITE PLAN APPROVED UNDER ZONING PERMIT #SDP240203
5/23/2024 Final Review - Documents Required NEEDED: *ENV HEALTH
6/4/2024 Final Review - Documents Required NEEDED: *ENV HEALTH
6/5/2024 Final Review - Documents Required NEEDED: *ENV HEALTH
6/10/2024 Final Review - Documents Required NEEDED: *ENV HEALTH
6/10/2024 Final Review - Documents Required NEEDED: *ENV HEALTH
6/17/2024 Final Review - Reviewed
6/17/2024 Final Review - Payment Needed
6/24/2024 Final Review - Payment Needed
7/1/2024 Final Review - Payment Needed
7/2/2024 Permit Issued Permit #000050264 created and approved.
Contractors
Name/ Business License Title Role
James F Boone
C.a. Boone Construction Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CGC1531762 Cert. General Contractor
Blake W Graham
Graham & Sons Electric Inc
EC13006720 Cert. Electrical Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 6/18/2024
Failed: Modular - Permanent Power & Final Need To Tie 125 Amp Breaker Together Or Install Double Breaker, Need Steps And Ramp Installed. Troy Crews 8/2/2024
Passed: Electrical - Permanent Power Troy Crews 8/14/2024
Release to power company Troy Crews 8/14/2024
Failed: Modular - Permanent Power & Final Need Handrail Both Sides Of Steps And Ramp. Ramp Need Access To A Handicap Parking Spot. Troy Crews 8/14/2024
Passed: Modular - Permanent Power & Final Items Corrected Troy Crews 8/22/2024
Release to power company Troy Crews 8/22/2024