| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
6/26/2024 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
7/1/2024 |
| Passed: Engineering - Driveway Spot Check |
No Construction Is Being Done At This Time |
Smith, Blake |
1/3/2025 |
| Cancelled: Engineering - Final Driveway |
|
Mgarber |
1/15/2026 |
| Failed: Engineering - Final Driveway |
inspection Notes: This Driveway Has Not Been Constructed. |
Beach, Garrett |
1/16/2026 |
| Failed: Engineering - Driveway Spot Check |
inspection Notes: No Driveway Present. |
Beach, Garrett |
1/21/2026 |
| (Requested) Engineering-Driveway Spot Check Failure Review |
|
|
|