Mobile Home
Permit
| Application #: | 65505 |
| Permit #: |
000050227 |
| Related Permit: |
|
| Submitted: | Wednesday, May 22, 2024 |
| Issued: | Thursday, June 27, 2024 |
| Expires: | Monday, July 22, 2024 |
| Completed: | Monday, July 22, 2024 |
| Status: |
Completed |
| Septic Release? |
Yes |
Notes
**MFE= 1' ABOVE THE ROAD
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0485C |
| Mobile Home is a: |
Double Wide |
| Year Built |
2024 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
56 |
| Driveway access to home: |
Private Driveway Permit |
| Installation Decal # |
106235 |
| Septic # |
24-0428 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
FL26100PHA105992AB |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
| How many of bedrooms does this home have? |
3 |
| How many bathrooms does this home have? |
2 |
Review Notes
| 5/22/2024 |
Application pending. |
| 5/22/2024 |
Application submitted by applicant. |
| 5/28/2024 |
Point Review - Printed-Online Application |
| 5/30/2024 |
Zoning Review - Reviewed |
| 6/3/2024 |
Plan Review - Reviewed |
| 6/4/2024 |
Final Review - Processing |
| 6/7/2024 |
Final Review - Documents Required |
| 6/10/2024 |
Final Review - Documents Required |
| 6/17/2024 |
Final Review - Documents Required |
| 6/25/2024 |
Final Review - Corrections Needed |
| 6/27/2024 |
Final Review - Payment Needed |
| 6/27/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Kyle Johnson
|
IH1126657 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Timothy D Shatto Shatto Heating & Air, Inc.
|
CAC057875 |
A/c Class B |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Cancelled: Mobile Home - Mobile Home Set-Up Final |
|
Emaleigh Williams |
7/16/2024 |
| Cancelled: Engineering - Setbacks |
|
Emaleigh Williams |
7/16/2024 |
| Septic Release Inspection |
|
Health Dept |
7/19/2024 |
| Passed: Engineering - Setbacks |
Appears To Located Per Site Plan Approved, No Survey Marking |
Gary Pitzer |
7/22/2024 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Gary Pitzer |
7/22/2024 |
| Release to power company |
|
Gary Pitzer |
7/22/2024 |