| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
6/5/2024 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
6/27/2024 |
| Passed: Building - Monolithic Slab |
|
Gary Pitzer |
7/12/2024 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
7/12/2024 |
| Passed: Building - Roof Decking |
|
Gary Pitzer |
8/15/2024 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Gary Pitzer |
8/15/2024 |
| Passed: Building - Framing |
|
Gary Pitzer |
8/15/2024 |
| Passed: Building - Rated Assembly Fastening |
|
Gary Pitzer |
8/15/2024 |
| Passed: Building - Strapping |
|
Gary Pitzer |
8/15/2024 |
| Passed: Building - Wall Sheathing |
|
Gary Pitzer |
8/15/2024 |
| Passed: Mechanical - Rough In |
|
Gary Pitzer |
11/7/2024 |
| Passed: Electrical - 2nd Rough-In |
Walls Only, Partial Ceiling, Need To See Feeder Cable At The Of Insulation |
Gary Pitzer |
12/12/2024 |
| Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Gary Pitzer |
12/12/2024 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
12/12/2024 |
| Failed: Electrical - 2nd Rough-In |
Cable Threw Attis Has To Be Change To All Conduit Or A Cable With An Outer Approvable Shielding (ser) |
Gary Pitzer |
12/23/2024 |
| Passed: Building - Insulation |
|
Matt Forsyth |
1/10/2025 |
| Cancelled: Electrical - 2nd Rough-In |
|
Matt Forsyth |
1/10/2025 |
| Rescheduled 1/13/2025:Electrical - 2nd Rough-In |
|
Melissa Garber |
1/10/2025 |
| Passed: Electrical - 2nd Rough-In |
Defect Corrected |
Gary Pitzer |
1/13/2025 |
| Passed: Electrical - Permanent Power |
|
Gary Pitzer |
12/16/2025 |
| Release to power company |
|
Gary Pitzer |
12/16/2025 |
| Passed: Building - Final |
|
Gary Pitzer |
12/18/2025 |