Permit Details

Permit Search

Permit

New Residential Construction

1130 SW BLUFF DR
FORT WHITE, FL 32038

Permit #
000050204
Application #
65073
Status Completed
  1. Submitted Apr 29, 2024
  2. Issued Jun 25, 2024
  3. Expires May 5, 2025
  4. Completed Nov 6, 2024

Property

Parcel #
04236-047
Owner
Depree Warren
Acres
1.64
Subdivision
Cedar Spring Shores
Zoning
ESA-2
Flood zone
AE
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
36' One foot above FEMA Map Elevation
Requirement needed
By Final Inspection
Document needed is
an Elevation Certificate for Finished Construction
Document receieved
Yes
Fema map number
12023C0469C
Water source
Sante Fe
In floodway
Y
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
12'
Setback Side 2
12'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1536
Total Area (Sqft)
1907
Building Height
27
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
residential
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0382
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Zoning Review - Documents Required
  5. Zoning Review - Reviewed
  6. Zoning Review - Documents Required
  7. Zoning Review - Documents Required
  8. Zoning Review - Documents Required
  9. Zoning Review - Reviewed
  10. Point Review - Printed-Online Application
  11. Plan Review - Plumbing Approved
  12. Plan Review - Mechanical Approved
  13. Plan Review - Electrical Approved
  14. Plan Review - Building Approved
  15. Plan Review - Reviewed
  16. Final Review - Processing
  17. Final Review - Reviewed
  18. Final Review - Reviewed
  19. Final Review - Payment Needed
  20. Permit Issued
  21. Final Review - Payment Needed

Contractors

  • Stuart L Amira

    Amira Builders, Inc.

    License
    CRC1327171
    Title
    Cert. Residential
    Role
    Contractor

    County License & State License Expired.

  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Benjamin T Keeler

    Keeler Roofing, Llc

    License
    CCC1330509
    Title
    Cert. Roofing
    Role
    Subcontractor
  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Robert M Bounds

    Bounds Heating & Air Inc

    License
    CAC057642
    Title
    Class A A/c
    Role
    Subcontractor

Inspections

  1. May 24, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Jul 1, 2024

    Passed: Building - Footer

    Inspected by Anthony Aslan

  3. Jul 1, 2024

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Jul 10, 2024

    Passed: Building - Vertical Cells/Columns

    Inspected by Anthony Aslan

  5. Jul 24, 2024

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  6. Jul 24, 2024

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  7. Aug 16, 2024

    Passed: Building - Framing

    Inspected by Anthony Aslan

  8. Aug 16, 2024

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Anthony Aslan

  9. Aug 16, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  10. Aug 16, 2024

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  11. Aug 16, 2024

    Failed: Plumbing/Gas - 1st Underground Rough–In

    No Water System

    Inspected by Anthony Aslan

  12. Aug 16, 2024

    Failed: Plumbing/Gas - 2nd Rough-In

    No Water On System No Pressure Gauge

    Inspected by Anthony Aslan

  13. Aug 16, 2024

    Failed: Plumbing/Gas - Tub Set/Shower Pan

    No Water In Shower Pans

    Inspected by Anthony Aslan

  14. Aug 20, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Water On System

    Inspected by Anthony Aslan

  15. Aug 20, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Pressure On System

    Inspected by Anthony Aslan

  16. Aug 20, 2024

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Water In Pans

    Inspected by Anthony Aslan

  17. Aug 22, 2024

    Passed: Building - Insulation

    Walls & Valted Ceiling Only

    Inspected by Anthony Aslan

  18. Oct 4, 2024

    Passed: Electrical - Permanent Power

    Inspected by Anthony Aslan

  19. Oct 4, 2024

    Release to power company

    Inspected by Anthony Aslan

  20. Nov 6, 2024

    Certificate-Release Certificate

    Inspected by Anthony Aslan

  21. Nov 6, 2024

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Anthony Aslan

Documents