Permit Details

Permit Search

Permit

Roof Replacement or Repair

263 SW MINTER RD
LAKE CITY, FL 32024

Permit #
000050187
Application #
65949
Status Completed
  1. Submitted Jun 24, 2024
  2. Issued Jun 24, 2024
  3. Expires Dec 28, 2024
  4. Completed Jul 1, 2024

Property

Parcel #
09743-000
Owner
Coupal Jerry K, Kains-coupal Deborah M
Acres
4.93
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0505C
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Replace any rotten wood once tear off is complete
Type of structure
Mobile Home
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
26
No. of Stories
1
Roof Pitch
2:12 to 4:12
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL10674-R19
Other Roofing Product Type Not Listed
Rhino Roof Underlayment FL15216-R13
Product Manufacturer
Owens Corning
Product Description
Tru Def. Duration
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Corrections Needed
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

  • Clark R Briggs Jr

    Kayco Roofing Llc

    License
    CCC1328803
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. Jun 26, 2024

    Passed: Re-Roof - In Progress

    Drying In, Shingles Started

    Inspected by Anthony Aslan

  2. Jul 1, 2024

    Passed: Re-Roof - Final

    Gates Closed, No Answer Appears Complete From Distance And Photos/ Affidavit

    Inspected by Gary Pitzer