Inspection |
Notes |
Performed By |
Date |
Septic Release Inspection |
|
Health Dept |
6/18/2024 |
Passed: Building - Footer |
|
Matt Forsyth |
7/25/2024 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
7/25/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Water Supply Has Been Installed Underground Under Pressure Also |
Matt Forsyth |
8/20/2024 |
Passed: Building - Slab |
Nice Rebar Work |
Matt Forsyth |
8/29/2024 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
9/20/2024 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
9/20/2024 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
9/20/2024 |
Passed: Building - Framing |
Framing Is Missing Some H2 Fives On Cable Lookout Framing Members Need To Replace All Tico Nails With Three Inch Galvanized Nails On All Base Plates |
Matt Forsyth |
9/30/2024 |
Failed: Building - Framing |
Post Were Finished With Material Could Not See 3 Inch Nails |
Matt Forsyth |
11/22/2024 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
11/22/2024 |
Failed: Mechanical - Rough In |
Fresh Air Return Need Duck That Is Listed On Fireplace |
Matt Forsyth |
11/22/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
11/22/2024 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Shower Below Finish Floor |
Matt Forsyth |
11/22/2024 |
Passed: Building - Insulation |
R 19 Walls R30 Partial Ceiling Wake Me Up |
Matt Forsyth |
12/2/2024 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
4/3/2025 |
Release to power company |
|
Matt Forsyth |
4/3/2025 |
Passed: Electrical - Permanent Power |
Service Entrance To Meter Can Was Placed In Different Location |
Matt Forsyth |
4/21/2025 |
Release to power company |
|
Matt Forsyth |
4/21/2025 |
Passed: Building - Final |
All Requirements Met-- Ok To Issue Co-- 5.21.25 Mg |
Matt Forsyth |
5/21/2025 |