Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

200 NW ANSLEY PL
LAKE CITY, FL 32055

Permit #
000050167
Application #
65728
Status Permit Issued
  1. Submitted Jun 6, 2024
  2. Issued Jun 21, 2024
  3. Expires Dec 16, 2028
  4. Completed —

Property

Parcel #
02202-115
Owner
Hazen Linda Revocable Trust Dated February 18, 2020,
Acres
4.21
Subdivision
—
Zoning
PRRD
Flood zone
A
District
3

Permit

Status
Permit Issued
Septic release
N/A
Related permit
Storage Building: 000050862

Job Details

Elevation regulation
Accessory Use
Finished floor requirement
Non-Habitable Structure
Fema map number
12023C0280D
Building Permit #
000050862
Standards
Shall conform to Public Works Determinations as stated below
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Type of connection for access road
Rural Driveway
Type of construction of property
Other
If the type of construction is not listed, please describe below
Detached garage residential
Normal vehicle usage:
Automobiles;Trucks
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
Estimated Number of Vehicle trips per day
4
Is the access for commercial or residential use?
Residential
County Road Type
Paved

Status & Review History

  1. Pending applicant completion and submission.
  2. Application submitted by applicant.
  3. Pending Public Works Application Approval
  4. Application Approved by Public Works
  5. Final Review - Payment Needed
  6. Pending initial driveway inspection
  7. Permit Issued

Contractors

  • Matthew R Cummings

    Little & Williams, Inc.

    License
    CBC1259800
    Title
    Building Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  1. Jun 6, 2024

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Inspected by Chad Williams

  2. Jun 17, 2024

    Rescheduled 6/18/2024:Engineering - Initial Driveway

    Inspected by Melissa Garber

  3. Jun 18, 2024

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  4. Dec 16, 2024

    Passed: Engineering - Driveway Spot Check

    Under Construction

    Inspected by Smith, Blake

  5. Dec 17, 2025

    Passed: Engineering - Driveway Spot Check

    Inspected by Smith, Blake