Permit Details

Permit Search

Permit

New Residential Construction

749 SW COLES CT
FORT WHITE, FL 32038

Permit #
000050011
Application #
65119
Status Permit Issued
  1. Submitted Apr 30, 2024
  2. Issued May 31, 2024
  3. Expires May 12, 2027
  4. Completed —

Property

Parcel #
04145-005
Owner
Fancher Richard,
Acres
9.56
Subdivision
Coles Unr
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Permit Issued
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0490C
This is the construction of a
Single Family Dwelling
Setbacks Front
35'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2432
Total Area (Sqft)
2432
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY DWELLING
Building Code Edition
2023 FLORIDA BUILDING CODE 8TH EDITION AND 2020 NATIONAL ELECTRICAL CODE
Septic# (00-0000) or (X00-000)
24-0344
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Point Review - Printed-Online Application
  2. Zoning Review - Reviewed
  3. Plan Review - Building Approved
  4. Plan Review - Electrical Approved
  5. Plan Review - Mechanical Approved
  6. Plan Review - Plumbing Approved
  7. Plan Review - Fuel/Gas Approved
  8. Plan Review - Reviewed
  9. Final Review - Documents Required
  10. Final Review - Documents Required
  11. Final Review - Documents Required
  12. Final Review - Reviewed
  13. Final Review - Payment Needed
  14. Permit Issued

Contractors

This is an owner-builder project.

  1. Jul 16, 2024

    Failed: Building - Slab

    Not Ready

    Inspected by Anthony Aslan

  2. Jul 16, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  3. Jul 19, 2024

    Septic Release Inspection

    Inspected by Health Dept

  4. Jul 26, 2024

    Passed: Building - Footer

    Inspected by Anthony Aslan

  5. Jul 26, 2024

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  6. Aug 22, 2024

    Failed: Building - Roof Decking

    Nail Embedded In Sheathing Same For Walls

    Inspected by Anthony Aslan

  7. Aug 29, 2024

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  8. Aug 29, 2024

    Passed: Building - Wall Sheathing

    Renailed

    Inspected by Anthony Aslan

  9. Feb 20, 2025

    Cancelled: Electrical - 1st Underground Rough–In

    Inspected by Anthony Aslan

  10. Feb 20, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  11. Feb 20, 2025

    Failed: Building - Framing

    Need Screw On King Wall Studs

    Inspected by Anthony Aslan

  12. Apr 11, 2025

    Passed: Building - Framing

    Check Studs Missing Screws On Any Other Inspections

    Inspected by Anthony Aslan

  13. Nov 13, 2026

    Passed: Building - Spot Check

    Second Rough Electrical Complete

    Inspected by Matt Forsyth

Documents