Permit Details

Permit Search

Permit

Mobile Home

392 NW WINFIELD ST
LAKE CITY, FL 32055

Permit #
000049926
Application #
64981
Status Completed
  1. Submitted Apr 21, 2024
  2. Issued May 23, 2024
  3. Expires Dec 17, 2024
  4. Completed Jun 25, 2024

Property

Parcel #
01862-007
Owner
Bennett Hosia A Sr, Bennett Cheral
Acres
2.97
Subdivision
—
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0190D
Mobile Home is a:
Double Wide
Year Built
2024
Width (Ft.In)
28
Length (Ft.In)
60
Driveway access to home:
Existing Drive
Installation Decal #
110735
Special temporary use permit number:
STU240403
Septic #
24-0386
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
LOHGA20039820
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Reviewed
  7. Final Review - Processing
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • David Albright

    David Albright Mobile Home Svc Llc

    License
    IH1129420
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Gary L Johnston

    Lightning R Services Llc

    License
    EC13012402
    Title
    Cert. Electrical
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Jun 20, 2024

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Final

    Inspected by Troy Crews

  2. Jun 20, 2024

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jun 25, 2024

    Release to power company

    Inspected by Melissa Garber

  4. Jun 25, 2024

    Release to power company

    Inspected by Troy Crews

  5. Jun 25, 2024

    Certificate-Release Certificate

    Inspected by Troy Crews

  6. Jun 25, 2024

    Septic Release Inspection

    Inspected by Health Dept