| Septic Release Inspection |
|
Health Dept |
5/21/2024 |
| Passed: Engineering - Setbacks |
Appears To Meet Setbacks |
Gary Pitzer |
8/14/2024 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Both Ends Of Units Need Something Over The Marriage Line Of Two Structures That Is Waterproof And Siding Installed. Osb Showing At Time Of Inspection. Also No Gasket Material Was Able To Be Seen On One End? Please Take Pictures Of These Items Before Covering. |
Gary Pitzer |
8/14/2024 |
| Mobile Home-Mobile Home Set-Up Final |
Contractor Supplied Photos Verifying Seal Are On Both Ends Of Units, This Will Not Complete Permit. Still Need To Verify Siding Is Complete |
Gary Pitzer |
8/16/2024 |
| Release to power company |
Rec'd Drive And Septic |
Matt Forsyth |
8/20/2024 |
| Certificate-Release Certificate |
Rec'd Septic And Drive |
Matt Forsyth |
8/20/2024 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Items Have Been Addressed Need Driveway Released To Complete |
Matt Forsyth |
8/20/2024 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/20/2024 |