| Septic Release Inspection |
|
Health Dept |
4/16/2024 |
| Passed: Engineering - Setbacks |
Appears To Be With Site Plan, No Markers |
Gary Pitzer |
6/20/2024 |
| Passed: Building - Monolithic Slab |
2#5 Rebar On Chairs, Wire For Slab, Plastic And Taped |
Gary Pitzer |
6/20/2024 |
| Passed: Building - Framing |
|
Gary Pitzer |
8/30/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
8/30/2024 |
| Failed: Electrical - Permanent Power |
Need Gfci Protection On Storage Are Receptacles |
Gary Pitzer |
8/30/2024 |
| Failed: Building - Final |
1. Conduit Loos On Exterior, E. No Gfci Protection On Outlets |
Gary Pitzer |
10/28/2024 |
| Passed: Building - Final |
Defects Corrected |
Gary Pitzer |
10/30/2024 |