Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
No Porta Potty On Site |
Anthony Aslan |
6/13/2024 |
Passed: Engineering - Setbacks |
Appears Within Setbacks |
Anthony Aslan |
6/13/2024 |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
6/24/2024 |
Release to power company |
|
Anthony Aslan |
6/24/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
7/16/2024 |
Passed: Building - Slab |
|
Anthony Aslan |
7/19/2024 |
Failed: Building - Wall Sheathing |
Not Ready |
Anthony Aslan |
8/13/2024 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
8/19/2024 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
8/30/2024 |
Passed: Building - Framing |
Anchors Missing In Garage And House, Blocking In Front North Corner Not Nailed In Attic |
Anthony Aslan |
8/30/2024 |
Failed: Mechanical - Rough In |
No Screws In Kitchen Exhaust Piping
venting Missing On Exhaust Fans, No Strapping On Venting Piping |
Anthony Aslan |
10/11/2024 |
Failed: Electrical - 2nd Rough-In |
Switches At Front Door Hanging |
Anthony Aslan |
10/11/2024 |
Failed: Plumbing/Gas - 2nd Rough-In |
Corrections To Framing Not Addressed |
Anthony Aslan |
10/11/2024 |
Passed: Building - Framing |
Corrections Made |
Anthony Aslan |
10/18/2024 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
10/18/2024 |
Passed: Mechanical - Rough In |
Correctios Made |
Anthony Aslan |
10/18/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
10/18/2024 |
Passed: Building - Insulation |
Spray Foam Attic And Batt In Walls |
Anthony Aslan |
11/26/2024 |
Passed: Electrical - Permanent Power |
Need Septic Release
need Outlets In Kitchen |
Anthony Aslan |
2/20/2025 |
Septic Release Inspection |
Pending Drive Final Prior To Power Release |
Health Dept |
3/7/2025 |
Release to power company |
|
Melissa Garber |
3/13/2025 |
Passed: Building - Final |
Need Picture Of Stove In Place-- Termite Final Not Uploaded-- 5.13.25 Mg |
Anthony Aslan |
5/8/2025 |
Certificate-Release Certificate |
|
Anthony Aslan |
5/15/2025 |