| Septic Release Inspection |
|
Health Dept |
5/14/2024 |
| Passed: Building - Footer |
|
Anthony Aslan |
7/26/2024 |
| Passed: Engineering - Setbacks |
Appears To Be Within Setbacks |
Anthony Aslan |
7/26/2024 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
10/17/2024 |
| Passed: Building - Slab |
|
Anthony Aslan |
11/19/2024 |
| Passed: Building - Ext Strapping/Wall Sheathing |
Strapping Needs To Be Cut To Verify Nailing
need Engineering On Sheathing Not Reaching Top Of Top Plate |
Anthony Aslan |
12/19/2024 |
| Passed: Building - Roof Decking |
|
Anthony Aslan |
1/22/2025 |
| Passed: Building - Framing |
|
Anthony Aslan |
2/14/2025 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
2/14/2025 |
| Cancelled: Building - Roof Decking |
|
Anthony Aslan |
3/5/2025 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
4/8/2025 |
| Passed: Mechanical - Rough In |
|
Anthony Aslan |
4/8/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
4/8/2025 |
| Passed: Building - Insulation |
Walls And Ceiling Batted |
Anthony Aslan |
7/16/2025 |
| Cancelled: Electrical - 2nd Rough-In |
|
Mgarber |
1/2/2026 |
| Passed: Electrical - Permanent Power |
|
Gary Pitzer |
1/2/2026 |
| Release to power company |
|
Gary Pitzer |
1/2/2026 |
| Cancelled: Electrical - 2nd Rough-In |
|
Gpitzer |
1/2/2026 |
| Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Christian Allen |
2/10/2026 |
| Passed: Building - Final |
Blower Door Uploaded. Dwelling Appears To Be 1 Foot Above Rd. -- Termite Final Required Prior To Release Of Co-- 4.2.26 Mg |
Christian Allen |
4/1/2026 |