| Septic Release Inspection |
|
Health Dept |
3/26/2024 |
| Passed: Electrical - Pool/Deck Bonding |
Did Not See Hand Rail Bonding |
Anthony Aslan |
6/12/2024 |
| Passed: Swimming Pool - Pool Deck/Piping Pressure |
35 Psi |
Anthony Aslan |
6/12/2024 |
| Passed: Swimming Pool - Pool Footer |
|
Anthony Aslan |
6/12/2024 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
6/12/2024 |
| Passed: Swimming Pool - Pool Steel and Ground |
|
Anthony Aslan |
6/12/2024 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
6/12/2024 |
| Passed: Swimming Pool - Pool Safety and Final |
No Gates With No Climb Fence |
Anthony Aslan |
8/29/2024 |