| Failed: Electrical - Above Ceiling |
No Access |
Anthony Aslan |
5/13/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
5/14/2024 |
| Cancelled: Electrical - Above Ceiling |
|
Anthony Aslan |
5/14/2024 |
| Failed: Building - Framing |
When Inspecting Electrical, Notice Issues With Framing, If You Have Pictures Of Before Framing Would Like To See Them. If Not Engineer Will Need To Sign Off On Framing |
Anthony Aslan |
5/20/2024 |
| Failed: Building - Framing |
House Locked No Entry, Also Need Engineer Letter On As Built Framing For Approval. |
Troy Crews |
6/17/2024 |
| Passed: Building - Framing |
|
Anthony Aslan |
6/18/2024 |
| Passed: Building - Insulation |
|
Anthony Aslan |
6/27/2024 |
| Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
9/17/2024 |
| Passed: Building - Final |
|
Christian Allen |