3/6/2024
|
Application pending.
|
3/14/2024
|
Application submitted by applicant.
|
3/15/2024
|
Point Review - Printed-Online Application
NEEDED
* STUP APPROVAL/AFFIDAVIT
* 911 ADDRESS - APPLY ONLINE
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
|
3/18/2024
|
Plan Review - Reviewed
NEEDED
* STUP APPROVAL/AFFIDAVIT
* 911 ADDRESS - APPLY ONLINE
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
|
3/27/2024
|
Zoning Review - Corrections Needed
THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
Parcel was split 03999-006 and 03999-010 -Stup requires that it be put back together.
|
3/27/2024
|
Zoning Review - Corrections Needed
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
**PARCEL WAS SPLIT WHILE APPLYING FOR THE STUP (THEY WERE REQUESTED TO ADD WIFE TO PARCEL SINCE THE STUP WAS FOR HER SISTER). REQUIRES THAT IT BE PUT BACK TOGETHER TO ISSUE THE MH PERMIT.
|
4/2/2024
|
Zoning Review - Reviewed
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
**PARCEL WAS SPLIT WHILE APPLYING FOR THE STUP (THEY WERE REQUESTED TO ADD WIFE TO PARCEL SINCE THE STUP WAS FOR HER SISTER). REQUIRES THAT IT BE PUT BACK TOGETHER TO ISSUE THE MH PERMIT.
|
4/8/2024
|
Final Review - Documents Required
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
*ENGINEER ELEVATION LETTER REQUIRED PRIOR TO PERMIT ISSUANCEDUE TO ELEVATION DIFFERENCE
|
4/12/2024
|
Final Review - Reviewed
**UPDATED ENGINEER LETTER TO REFERENCE CORRECT ADDRESS PRIOR TO FINAL BEING GRANTED-- MG WILL REMOVE BLOCK WHEN RECEIVED
|
4/12/2024
|
Final Review - Payment Needed
**UPDATED ENGINEER LETTER TO REFERENCE CORRECT ADDRESS PRIOR TO FINAL BEING GRANTED-- MG WILL REMOVE BLOCK WHEN RECEIVED
|
4/12/2024
|
Permit Issued
Permit # created and approved from payment.
|