Permit Details

Permit Search

Permit

Mobile Home

712 SW SHILOH ST
FORT WHITE, FL 32038

Permit #
000049601
Application #
64538
Status Completed
  1. Submitted Mar 12, 2024
  2. Issued Apr 11, 2024
  3. Expires Nov 2, 2024
  4. Completed May 6, 2024

Property

Parcel #
04203-017
Owner
Curran Justin Lee,
Acres
5.32
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
MFE = 32" ABOVE THE ADJACENT GROUND FOR ENTIRE PERIMETER OF FOUNDATION
Fema map number
12023C0495C
Mobile Home is a:
Double Wide
Year Built
2024
Width (Ft.In)
28
Length (Ft.In)
72
Driveway access to home:
Existing Drive
Installation Decal #
106233
Septic #
24-0236
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
DES290GA2413559AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Plan Review - Reviewed
  4. Point Review - Documents Required
  5. Zoning Review - Documents Required
  6. Final Review - Documents Required
  7. Zoning Review - Documents Required
  8. Final Review - Documents Required
  9. Zoning Review - Reviewed
  10. Final Review - Reviewed
  11. Final Review - Payment Needed
  12. Permit Issued

Contractors

  • Kyle Johnson

    License
    IH1126657
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Mar 27, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. May 6, 2024

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Anthony Aslan

  3. May 6, 2024

    Release to power company

    Inspected by Anthony Aslan

  4. May 6, 2024

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan