Mobile Home
Permit
| Application #: | 64495 |
| Permit #: |
000049600 |
| Related Permit: |
|
| Submitted: | Wednesday, March 20, 2024 |
| Issued: | Thursday, April 11, 2024 |
| Expires: | Thursday, May 30, 2024 |
| Completed: | Thursday, May 30, 2024 |
| Status: |
Completed |
| Septic Release? |
Yes |
Notes
*MFE= 1' ABOVE THE ROAD
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0379C |
| Mobile Home is a: |
Double Wide |
| Year Built |
2024 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
56 |
| Driveway access to home: |
D.O.T. Permit |
| Installation Decal # |
108837 |
| Septic # |
24-0301 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
WHC031361GAABAC |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 3/11/2024 |
Application pending. |
| 3/20/2024 |
Application submitted by applicant. |
| 3/24/2024 |
Point Review - Printed-Online Application |
| 3/24/2024 |
Point Review - Reviewed |
| 3/28/2024 |
Plan Review - Reviewed |
| 3/28/2024 |
Zoning Review - Reviewed |
| 4/8/2024 |
Final Review - Documents Required |
| 4/11/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Ernest S Johnson Dependable Mobile Home Service
|
IH1025249 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Rodney L Cribbs Quality Air Care Llc
|
RA13067616 |
Reg. A/c Class “b” |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Bonding Wire Not Visible And Final Septic Needed |
Matt Forsyth |
5/14/2024 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
5/14/2024 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Bonding Wire Installed
need Septic Release |
Anthony Aslan |
5/16/2024 |
| Passed: Engineering - Setbacks |
Appears To Be With In Set Backs |
Anthony Aslan |
5/16/2024 |
| Release to power company |
|
Melissa Garber |
5/30/2024 |
| Certificate-Release Certificate |
|
Anthony Aslan |
5/30/2024 |
| Septic Release Inspection |
|
Health Dept |
5/30/2024 |
| Release to power company |
|
Melissa Garber |
6/14/2024 |