Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 5068 SW BIRLEY AVE
LAKE CITY, FL 32024
Parcel #: 03077-027
Acres: 3.18
Owner: Deloach Frederick, Deloach Kerrie
Subdivision:
Zoning: A-3
Flood Zone: X
District: 2
Application #: 64624
Permit #: 000049577
Related Permit: Culvert: 000049578
Submitted: Thursday, March 21, 2024
Issued: Thursday, April 25, 2024
Expires: Thursday, October 3, 2024
Completed: Thursday, October 3, 2024
Status: Completed
Septic Release? Yes
Notes:
SFLP 231001 12" ABOVE THE ADJACENT GROUND FOR THE ENTIRE PERIMETER USE THE EASEMENT ENTRANCE, 98', AS REFERENCE FOR 1' ABOVE ROAD
Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 12" ABOVE THE ADJACENT GROUND FOR THE ENTIRE PERIMETER
Fema map number 12023C0380C
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 2379
Total Area (Sqft) 2955
Building Height 15
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 24-0188
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 200
Review Notes
3/21/2024 Point Review - Reviewed
3/27/2024 Plan Review - Plumbing Approved
3/27/2024 Plan Review - Mechanical Approved
3/27/2024 Plan Review - Electrical Approved
3/27/2024 Plan Review - Building Approved
3/27/2024 Plan Review - Reviewed
3/27/2024 Zoning Review - Processing
4/3/2024 Zoning Review - Reviewed
4/5/2024 Final Review - Reviewed
4/5/2024 Final Review - Payment Needed
4/9/2024 Permit Issued
4/25/2024 Permit Reissued
10/1/2024 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Brian T Giebeig
Trent Giebeig Construction,inc.
CRC1330693 Residential Contractor Contractor
Kenneth R Roche
Ken Roche Plumbing Inc Dba Plumbing Now
CFC1426527 Plumbing Contractor Subcontractor
Derrick L Williams
Dl Williams Heating & Cooling Llc
CAC1816913 Class "b" A/c Contractor Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Smith, Blake 4/15/2024
Passed: Building - Footer Matt Forsyth 4/16/2024
Passed: Engineering - Setbacks Matt Forsyth 4/16/2024
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 4/25/2024
Passed: Building - Slab Matt Forsyth 4/30/2024
Passed: Electrical - 1st Underground Rough–In Matt Forsyth 4/30/2024
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 5/23/2024
Failed: Building - Framing Windows And Doors Need To Be Installed To Complete A Framing Inspection Walls And Ceilings Are Fine Matt Forsyth 5/23/2024
Passed: Building - Roof Decking Matt Forsyth 5/23/2024
Passed: Electrical - 2nd Rough-In Gary Pitzer 6/10/2024
Passed: Mechanical - Rough In Gary Pitzer 6/10/2024
Passed: Plumbing/Gas - 2nd Rough-In Gary Pitzer 6/10/2024
Passed: Building - Insulation Walls Only Matt Forsyth 6/13/2024
Septic Release Inspection Health Dept 8/1/2024
Passed: Electrical - Permanent Power Troy Crews 10/2/2024
Release to power company Troy Crews 10/2/2024
Passed: Building - Final Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. Troy Crews 10/2/2024
Certificate-Release Certificate Blower Door Recieved Troy Crews 10/3/2024
Passed: Engineering - Initial Driveway Smith, Blake 10/14/2024
Passed: Engineering - Final Driveway Smith, Blake 10/14/2024
Documents
File Name Date File Size