Roof Replacement or Repair
Permit
| Application #: | 64741 |
| Permit #: |
000049532 |
| Related Permit: |
|
| Submitted: | Friday, March 29, 2024 |
| Issued: | Monday, April 1, 2024 |
| Expires: | Friday, May 17, 2024 |
| Completed: | Friday, May 17, 2024 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0467C |
| Type Roofing Job |
Partial Roof Repairs |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Remove 2 layers Roofing materials Metal & 2 Ply on small flat roof. Remove 1 layer of 2 ply on other small flat roof on back side. Remove all plywood decking & install new CDX. Install 1/4 Taper ISO. Install new 2 Ply SA Cap & Base & Install new flashing. |
| Type of structure |
Mobile Home |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
5 |
| No. of Stories |
1 |
| Roof Pitch |
Less than 2:12 |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Roll Roofing |
| Florida Product Approval Number |
FL2533-R16 |
| Product Manufacturer |
Certainteed |
| Product Description |
Low Slope |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
Use Existing |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 3/29/2024 |
Application pending. |
| 3/29/2024 |
Application submitted by applicant. |
| 4/1/2024 |
Final Review - Payment Needed |
| 4/1/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Lewis G Walker Lewis Walker Roofing Inc
|
CCC1333551 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
Low Pitched Dwelling |
Matt Forsyth |
4/4/2024 |
| Rescheduled 4/12/2024:Re-Roof - Final |
|
Emaleigh Williams |
4/11/2024 |
| Failed: Re-Roof - Final |
Gate Was Locked No Access Available |
Matt Forsyth |
4/12/2024 |
| Failed: Re-Roof - Final |
Transition Flashing Needed Between Metal And Roll Roofing |
Matt Forsyth |
4/15/2024 |
| Passed: Engineering - Access Road/Driveway Right-of-Way Integrity Inspection |
|
Matt Forsyth |
4/15/2024 |
| Passed: Re-Roof - Final |
Product Approval Numbers Have Been Loaded Bitumin Roof System Will Act As Transition Flashing Under Metal |
Matt Forsyth |
5/17/2024 |