Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit
Address 172 SW CREST GLN
LAKE CITY, FL 32024
Parcel #: 02905-319
Acres: 0.55
Owner: The Mcmullen Family Trust,
Subdivision: Woodcrest Unit 2
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 64728
Permit #: 000049519
Related Permit:
Submitted: Thursday, March 28, 2024
Issued: Thursday, March 28, 2024
Expires: Tuesday, April 23, 2024
Completed: Tuesday, April 23, 2024
Status: Completed
Septic Release? na
Notes:

Job Details
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 0.00
No. of Stories 1
Ventilation: Ridge Vent
Flashing: Use Existing
Drip Edge: Use Existing
Valley Treatment: New Metal
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Explain if not removing the existing roofing material? overlay
Type of New Roofing Product Metal
Florida Product Approval Number fl17992.r3
Product Manufacturer capital
Product Description capital rib
Sealed roof decking options: (Must select an option.) Other (explain)
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Fema map number 12023C0293D
Review Notes
3/28/2024 Permit Issued Permit #000049519 created and approved.
Contractors
Name/ Business License Title Role
Robert A Feasel
Robbies Roofing Inc
CCC1334954 Roofing Contractor Contractor
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Matt Forsyth 4/12/2024
Passed: Re-Roof - Final Affidavit In Documentation File Matt Forsyth 4/23/2024