Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 202 NE OWLRUN WAY
LAKE CITY, FL 32055
Parcel #: 04659-035
Acres: 0.84
Owner: Dees Achsah
Subdivision: Frank Thomas Unr
Zoning: A-2
Flood Zone: A
District: 1
Application #: 64122
Permit #: 000049504
Related Permit:
Submitted: Tuesday, February 6, 2024
Issued: Tuesday, March 26, 2024
Expires: Tuesday, July 9, 2024
Completed: Tuesday, July 9, 2024
Status: Completed
Septic Release? Yes
Notes:
MFE = 2' ABOVE DIRT ROAD
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement Two feet above the Dirt road
Fema map number 12023C0205D
Mobile Home is a: Double Wide
Year Built 2015
Width (Ft.In) 28
Length (Ft.In) 40
Driveway access to home: Existing Drive
Installation Decal # 106413
Special temporary use permit number: STU240207
Septic # (00-0000) or (X00-000) 24-0121
Setbacks Front 30'
Setback Side 1 25'
Setbacks Rear 25'
Dev Permit # F023-
Setback Side 2 25'
Are you applying for a 5 year temporary permit? Yes
Serial # LOHGA21530083AB
Wind Zone? 2
Residential or Commercial Use? Residential
Service Amps 200
Review Notes
2/6/2024 Application pending.
2/6/2024 Application submitted by applicant.
2/12/2024 Point Review - Printed-Online Application NEEDED * PREVIOUS STUP THAT WAS ISSUED HAS EXPIRED - THEY WILL NEED TO REAPPLY CONTACT ZONING * ENVIRONMENTAL HEALTH SIGNED SITE PLAN * STUP AFFIDAVIT * PREINSPECTION - HAS BEEN REQUESTED
2/12/2024 Plan Review - Reviewed NEEDED * PREVIOUS STUP THAT WAS ISSUED HAS EXPIRED - THEY WILL NEED TO REAPPLY CONTACT ZONING * ENVIRONMENTAL HEALTH SIGNED SITE PLAN * STUP AFFIDAVIT * PREINSPECTION - HAS BEEN REQUESTED
2/14/2024 Zoning Review - Documents Required NEEDED * PREVIOUS STUP THAT WAS ISSUED HAS EXPIRED - THEY WILL NEED TO REAPPLY CONTACT ZONING * ENVIRONMENTAL HEALTH SIGNED SITE PLAN * STUP AFFIDAVIT
2/19/2024 Zoning Review - Documents Required NEEDED * PREVIOUS STUP THAT WAS ISSUED HAS EXPIRED - THEY WILL NEED TO REAPPLY CONTACT ZONING * ENVIRONMENTAL HEALTH SIGNED SITE PLAN * STUP AFFIDAVIT
2/28/2024 Zoning Review - Reviewed NEEDED * PREVIOUS STUP THAT WAS ISSUED HAS EXPIRED - THEY WILL NEED TO REAPPLY CONTACT ZONING * STUP AFFIDAVIT
2/28/2024 Final Review - Documents Required NEEDED * PREVIOUS STUP THAT WAS ISSUED HAS EXPIRED - THEY WILL NEED TO REAPPLY CONTACT ZONING * STUP AFFIDAVIT
3/5/2024 Final Review - Documents Required NEEDED * PREVIOUS STUP THAT WAS ISSUED HAS EXPIRED - THEY WILL NEED TO REAPPLY CONTACT ZONING * STUP AFFIDAVIT
3/19/2024 Final Review - Documents Required NEEDED * PREVIOUS STUP THAT WAS ISSUED HAS EXPIRED - THEY WILL NEED TO REAPPLY CONTACT ZONING * STUP AFFIDAVIT
3/20/2024 Final Review - Documents Required NEEDED * PREVIOUS STUP THAT WAS ISSUED HAS EXPIRED - THEY WILL NEED TO REAPPLY CONTACT ZONING * STUP AFFIDAVIT
3/26/2024 Final Review - Reviewed
3/26/2024 Final Review - Payment Needed
3/26/2024 Permit Issued Permit #000049504 created and approved.
Contractors
Name/ Business License Title Role
Dale Houston
Dale Houstons Mobile Home Set Up And Service
IH1133271 Mh Installer (ih) Contractor
Glenn Whittington
Whittington Electric Inc
EC13002957 Electrical Contractor Subcontractor
Steven M Mollman
Mollman Air Conditioning And Refrigeration Llc
CAC1819696 Cert. A/c Class “b” Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - In County Pre-Mobile Home before set-up Troy Crews 2/13/2024
Septic Release Inspection Health Dept 2/21/2024
Failed: Mobile Home - Mobile Home Set-Up Final New Power Line Must Be Run From Pole To House, And Connect Sewer To Tank Troy Crews 6/5/2024
Passed: Engineering - Setbacks Troy Crews 6/5/2024
Passed: Engineering - Setbacks Appears To Match Layput Gary Pitzer 7/9/2024
Passed: Mobile Home - Mobile Home Set-Up Final Gary Pitzer 7/9/2024
Release to power company Gary Pitzer 7/9/2024