Permit Details

Permit Search

Permit

Roof Replacement or Repair

204 SW DUSTY GLN
LAKE CITY, FL 32024

Permit #
000049467
Application #
64603
Status Completed
  1. Submitted Mar 19, 2024
  2. Issued Mar 21, 2024
  3. Expires Oct 28, 2024
  4. Completed May 1, 2024

Property

Parcel #
02853-254
Owner
Dreier Burghard
Acres
1.67
Subdivision
Russwood Estates Unit 2
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0289D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
70
No. of Stories
2
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
fl10674-r19
Product Manufacturer
Owens Corning Asphalt Roof Shingles
Product Description
Asphalt Shingles
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued
  5. Permit Renewed
  6. Permit Renewed

Contractors

No contractors are listed on this permit.

Inspections

  1. Apr 22, 2024

    Passed: Re-Roof - In Progress

    In Progress With Tear Off Of Existing Roof Covering. Please Provide Progression Pictures Of All Different Phases Of Roof Project

    Inspected by Gary Pitzer

  2. May 1, 2024

    Passed: Re-Roof - Final

    Inspected by Gary Pitzer