Roof Replacement or Repair
Permit
| Application #: | 64507 |
| Permit #: |
000049444 |
| Related Permit: |
|
| Submitted: | Monday, March 11, 2024 |
| Issued: | Monday, March 18, 2024 |
| Expires: | Monday, April 1, 2024 |
| Completed: | Monday, April 1, 2024 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0381D |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Type of structure |
House |
| Roof Area (for this job) Sq Ft |
25.60 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Asphalt Shingles |
| Florida Product Approval Number |
FL10124_R35 |
| Product Manufacturer |
GAF |
| Product Description |
Timberline HDZ |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof. |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Mineral Surface |
Review Notes
| 3/11/2024 |
Application pending. |
| 3/11/2024 |
Application submitted by applicant. |
| 3/11/2024 |
City of Lake City Utilities Notified. |
| 3/11/2024 |
Final Review - Corrections Needed |
| 3/18/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Joel Dantzler Jr The Dantzler Group Inc
County License & State License & Liability Insurance & Workers Comp Expired. |
CCC057181 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
Work In Progress With Removal, Nailing And Startin Underlayment |
Gary Pitzer |
3/26/2024 |
| Passed: Culvert - Access Road/Driveway Right-of-Way Integrity Inspection |
|
Gary Pitzer |
4/1/2024 |
| Passed: Re-Roof - Final |
|
Gary Pitzer |
4/1/2024 |