Permit Details

Permit Search

Permit

Mobile Home

561 SE DEER ST
LAKE CITY, FL 32025

Permit #
000049434
Application #
63732
Status Completed
  1. Submitted Dec 28, 2023
  2. Issued Mar 15, 2024
  3. Expires Sep 21, 2024
  4. Completed Mar 25, 2024

Property

Parcel #
08332-079
Owner
Lynch Jennifer, Lynch Don
Acres
2.01
Subdivision
Price Creek Acres Unit 3 Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0315C
Mobile Home is a:
Double Wide
Year Built
1992
Width (Ft.In)
24
Length (Ft.In)
48
Driveway access to home:
Existing Drive
Installation Decal #
107283
Septic #
23-0850
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
flhmlcp39784108
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. City of Lake City Utilities Notified.
  2. Plan Review - Reviewed
  3. Point Review - Reviewed
  4. Zoning Review - Reviewed
  5. Final Review - Documents Required
  6. Final Review - Contact the Building Dept
  7. Final Review - Documents Required
  8. Final Review - Documents Required
  9. Final Review - Documents Required
  10. Permit Issued

Contractors

  • Glenn M Williams Jr

    North Fl Mobile Home Installers Llc

    License
    IH1054858
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Jan 16, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Jan 22, 2024

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Anthony Aslan

  3. Mar 19, 2024

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Picture Of Duct Work Connected To Unit And Trailer, Ground Wire Needs To Be Strapped Down On Pole, Blank Off Needed In Outside Electrical Panel For Missing Breaker

    Inspected by Anthony Aslan

  4. Mar 19, 2024

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  5. Mar 25, 2024

    Passed: Mobile Home - Mobile Home Set-Up Final

    Items Corrected

    Inspected by Troy Crews

  6. Mar 25, 2024

    Release to power company

    Inspected by Troy Crews

  7. Mar 25, 2024

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  8. Mar 26, 2024

    Release to power company

    Inspected by Troy Crews