Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 122 SW AMIEL CT
FORT WHITE, FL 32038
Parcel #: 04035-000
Acres: 0.78
Owner: Byrd Kyshia,
Subdivision:
Zoning:
Flood Zone: X
District: 2
Application #: 64009
Permit #: 000049422
Related Permit:
Submitted: Thursday, January 25, 2024
Issued: Thursday, March 14, 2024
Expires: Friday, February 28, 2025
Completed: Friday, February 28, 2025
Status: Completed
Septic Release? Yes
Notes:
FINISHED FLOOR ONE FOOT ABOVE ROAD
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0490C
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 1549
Total Area (Sqft) 1689
Building Height 18
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 24-0190
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
1/30/2024 Point Review - On Hold-Incomplete
2/19/2024 Plan Review - Building Approved
2/19/2024 Plan Review - Electrical Approved
2/19/2024 Plan Review - Mechanical Approved
2/19/2024 Plan Review - Plumbing Approved
2/19/2024 Plan Review - Fuel/Gas Approved
2/19/2024 Plan Review - Reviewed
2/26/2024 Point Review - Reviewed
2/26/2024 Zoning Review - Reviewed
2/26/2024 Final Review - Documents Required
2/29/2024 Final Review - Documents Required
3/1/2024 Final Review - Reviewed
3/1/2024 Final Review - Payment Needed
3/8/2024 Final Review - Payment Needed
3/13/2024 Final Review - Payment Needed
3/14/2024 Permit Issued
12/6/2024 Final Review - Payment Needed
12/18/2024 Final Review - Payment Needed
1/24/2025 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Cecilio Garcia
Kg Construction Llc
Liability Insurance & Workers Comp Expired.
CRC1329233 Cert Residential Contractor
Donald Davis
High Springs Electric Inc
EC0002306 Electrical Contractor Subcontractor
Donald R Davis
High Springs Electric Inc
CAC1815367 Class B A/c Subcontractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
CFC057960 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Dwv Piping, Water Lines Under Pressure And Holdiing, No Clean Out On Exterior Gary Pitzer 3/25/2024
Passed: Building - Footer Anthony Aslan 4/2/2024
Passed: Engineering - Setbacks Anthony Aslan 4/2/2024
Passed: Building - Roof Decking Matt Forsyth 4/19/2024
Passed: Building - Wall Sheathing Matt Forsyth 4/19/2024
Passed: Electrical - 2nd Rough-In Matt Forsyth 5/7/2024
Passed: Building - Framing Matt Forsyth 5/7/2024
Passed: Mechanical - Rough In Matt Forsyth 5/7/2024
Passed: Plumbing/Gas - 2nd Rough-In Will Need A Shower Pan Inspection From The Plumbers Matt Forsyth 5/7/2024
Passed: Building - Insulation Matt Forsyth 7/2/2024
Failed: Electrical - Permanent Power All Electrical Wires Shall Be Protected Made-up In The Box Or Wire Nuts Matt Forsyth 12/10/2024
Passed: Electrical - Permanent Power Septic Release Needed To Release Power Matt Forsyth 12/19/2024
Release to power company Melissa Garber 1/24/2025
Septic Release Inspection Health Dept 1/24/2025
Passed: Building - Final Certificate Of Occupancy Pending Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. Matt Forsyth 2/27/2025