Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 335 SE GRAHAM CT
LAKE CITY, FL 32025
Parcel #: 10642-000
Acres: 35.99
Owner: Zow Andrew
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 64252
Permit #: 000049396
Related Permit:
Submitted: Monday, February 19, 2024
Issued: Monday, March 11, 2024
Expires: Tuesday, April 16, 2024
Completed: Tuesday, April 16, 2024
Status: Completed
Septic Release? Yes
Notes:
FINISHED FLOOR 32 INCHES ABOVE GRADE ENTIRE PERIMITER PER ENGINEER
Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 32 INCHES ABOVE GRADE
Fema map number 12023C0508C
Mobile Home is a: Double Wide
Year Built 2024
Width (Ft.In) 28
Length (Ft.In) 48
Driveway access to home: Private Drive
Installation Decal # 108826
Septic # (00-0000) or (X00-000) 24-0165
Setbacks Front 30'
Setback Side 1 25'
Setbacks Rear 25'
Dev Permit # F023-
Setback Side 2 25'
Are you applying for a 5 year temporary permit? No
Serial # fl261000ha105749ab
Wind Zone? 2
Residential or Commercial Use? Residential
Service Amps 200
Review Notes
Contractors
Name/ Business License Title Role
Ernest S Johnson
Dependable Mobile Home Service
County License & State License Expired.
IH1025249 Mh Installer (ih) Contractor
Glenn Whittington
Whittington Electric Inc
EC13002957 Electrical Contractor Subcontractor
Timothy D Shatto
Shatto Heating & Air, Inc.
CAC057875 A/c Class B Subcontractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 4/12/2024
Passed: Engineering - Access Road/Driveway Right-of-Way Integrity Inspection Dirt Road Anthony Aslan 4/16/2024
Passed: Engineering - Setbacks Anthony Aslan 4/16/2024
Passed: Mobile Home - Mobile Home Set-Up Final Anthony Aslan 4/16/2024
Release to power company Anthony Aslan 4/16/2024
Documents
File Name Date File Size