Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Beach, Garrett |
3/6/2024 |
Passed: Building - Footer |
Watch For Dowel Placement |
Matt Forsyth |
3/12/2024 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
3/12/2024 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
3/18/2024 |
Release to power company |
|
Matt Forsyth |
3/18/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
4/16/2024 |
Passed: Building - Slab |
|
Matt Forsyth |
4/23/2024 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
5/28/2024 |
Passed: Building - Framing |
Structural Building Components Inspected Windows And Doors Not Installed |
Matt Forsyth |
5/28/2024 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
5/28/2024 |
Passed: Building - Strapping |
Keep An Eye On Nail Size Post Base |
Matt Forsyth |
5/28/2024 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
5/28/2024 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
6/11/2024 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
6/11/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
Tub Water Tested |
Matt Forsyth |
6/11/2024 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
6/11/2024 |
Passed: Building - Insulation |
|
Matt Forsyth |
6/24/2024 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
7/11/2024 |
Septic Release Inspection |
|
Health Dept |
7/12/2024 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
7/22/2024 |
Release to power company |
|
Matt Forsyth |
7/22/2024 |
Passed: Building - Final |
Fresh Air Makeup For Blower Door Test Confirmed |
Matt Forsyth |
9/12/2024 |
Certificate-Release Certificate |
|
Matt Forsyth |
9/16/2024 |