Permit Details

Permit Search

Permit

Roof Replacement or Repair

157 SE ROSEWOOD CIR
LAKE CITY, FL 32025

Permit #
000049310
Application #
64378
Status Completed
  1. Submitted Feb 28, 2024
  2. Issued Feb 28, 2024
  3. Expires Sep 17, 2024
  4. Completed Mar 21, 2024

Property

Parcel #
07592-114
Owner
Lewis Myra L
Acres
0.17
Subdivision
Eastside Village Unit 2
Zoning
RMF-1
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0311D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
DOUBLE LAYER shingles that are being removed and replaced with new shingles.
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
1660
No. of Stories
1
Roof Pitch
2:12 to 4:12
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL18355.1
Product Manufacturer
tamKO Building Products LLC
Product Description
astm D3462 asphalt shingles and hip and ridge shingles
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
Use Existing
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

  • Donald Burnsed

    True Force Roofing

    License
    CCC1333814
    Title
    Cert. Roofing
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Mar 18, 2024

    Passed: Re-Roof - In Progress

    Tear Off Inprogress

    Inspected by Anthony Aslan

  2. Mar 21, 2024

    Passed: Re-Roof - Final

    Inspected by Anthony Aslan