| Finished floor requirement |
|
| Fema map number |
12023C0505C |
| Type Roofing Job |
Re-Cover - New Material over Existing |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Put 26 G metal over existing shingles on 1x4 purlins on mobile home. 30 Sq. in total. |
| Type of structure |
Mobile Home |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
2700 |
| No. of Stories |
1 |
| Roof Pitch |
2:12 to 4:12 |
| Is the existing roof being removed? |
No |
| Explain if not removing the existing roofing material? |
Leaving existing shingles. |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
FL38840.02 |
| Product Manufacturer |
Integrity Metals |
| Product Description |
Exposed fastener PBR-Style panel with a 36" coverage, and nominal rib height of 1-1/4". |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Sealed roof decking explanation for other option. |
High Temp Peel & Stick - This is to cover the area where the deleted vents were and Synthetic underlayment installed in a half-lap. |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |