- Finished floor requirement
-
- Fema map number
- 12023C0505C
- Type Roofing Job
- Re-Cover - New Material over Existing
- Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
- Put 26 G metal over existing shingles on 1x4 purlins on mobile home. 30 Sq. in total.
- Type of structure
- Mobile Home
- Commercial or Residential
- Residential
- Roof Area (for this job) Sq Ft
- 2700
- No. of Stories
- 1
- Roof Pitch
- 2:12 to 4:12
- Is the existing roof being removed?
- No
- Explain if not removing the existing roofing material?
- Leaving existing shingles.
- Type of New Roofing Product
- Metal
- Florida Product Approval Number
- FL38840.02
- Product Manufacturer
- Integrity Metals
- Product Description
- Exposed fastener PBR-Style panel with a 36" coverage, and nominal rib height of 1-1/4".
- Building Code Edition
- 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
- Sealed roof decking options: (Must select an option.)
- Other (explain)
- Sealed roof decking explanation for other option.
- High Temp Peel & Stick - This is to cover the area where the deleted vents were and Synthetic underlayment installed in a half-lap.
- Ventilation:
- Ridge Vent
- Flashing:
- Replace All
- Drip Edge:
- Replace All
- Valley Treatment:
- New Metal
- Any cable and/or race-way wiring located on or within the roof assembly?
- No