1/15/2024
|
Application pending.
|
1/15/2024
|
Application submitted by applicant.
|
1/17/2024
|
Point Review - Printed-Online Application
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
|
1/17/2024
|
Point Review - Reviewed
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
|
1/18/2024
|
Plan Review - Reviewed
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
1/18/2024
|
Zoning Review - Reviewed
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
1/18/2024
|
Final Review - Documents Required
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
1/31/2024
|
Final Review - Documents Required
NEEDED:
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
*ENGINEER LETTER
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
2/7/2024
|
Final Review - Documents Required
NEEDED:
*ENGINEER LETTER
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
2/7/2024
|
Final Review - Reviewed
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
2/7/2024
|
Final Review - Payment Needed
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
2/16/2024
|
Final Review - Payment Needed
***MOVING FORWARD-- PLEASE USE MOST RECENT SUBFORM ON WEBSITE
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
2/19/2024
|
Permit Issued
Permit #000049240 created and approved.
|