Permit Details

Permit Search

Permit

New Residential Construction

179 SW MANDIBA DR
LAKE CITY, FL 32024

Permit #
000049218
Application #
63599
Status Completed
  1. Submitted Dec 13, 2023
  2. Issued Feb 15, 2024
  3. Expires Apr 8, 2025
  4. Completed Oct 10, 2024

Property

Parcel #
09280-112
Owner
Klamfoth Jeff, Klamfoth Angela
Acres
4.15
Subdivision
Oaks Of Lake City Phase 1
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
89'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2954
Total Area (Sqft)
4468
Building Height
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0007
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Documents Required
  6. Zoning Review - Reviewed
  7. Plan Review - Documents Required
  8. Plan Review - Documents Required
  9. Plan Review - Documents Required
  10. Plan Review - Documents Required
  11. Plan Review - Documents Required
  12. Plan Review - Documents Required
  13. Plan Review - Documents Required
  14. Plan Review - Documents Required
  15. Plan Review - Documents Required
  16. Plan Review - Documents Required
  17. Plan Review - Documents Required
  18. Plan Review - Plumbing Approved
  19. Plan Review - Mechanical Approved
  20. Plan Review - Electrical Approved
  21. Plan Review - Building Approved
  22. Final Review - Processing
  23. Final Review - Reviewed
  24. Permit Issued

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Feb 28, 2024

    Electrical -1st Underground Rough–In

    Bond Wire To Footer Steel

    Inspected by Gary Pitzer

  2. Feb 28, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  3. Feb 28, 2024

    Passed: Building - Footer

    2#5 On Chairs

    Inspected by Gary Pitzer

  4. Mar 13, 2024

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  5. Mar 13, 2024

    Release to power company

    Inspected by Gary Pitzer

  6. Mar 20, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Under Slab Drainage And Future Vents, Stub To Exterior, No Clean Out

    Inspected by Gary Pitzer

  7. Mar 28, 2024

    Passed: Building - Slab

    Wire And Steel Over Plastic Taped

    Inspected by Gary Pitzer

  8. Apr 18, 2024

    Passed: Building - Wall Sheathing

    Ok Go Cover Will Need Eng. Elevation Letter Asap

    Inspected by Gary Pitzer

  9. Apr 18, 2024

    Rescheduled 4/19/2024:Building - Roof Decking

    Inspected by Gary Pitzer

  10. Apr 19, 2024

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  11. Jun 4, 2024

    Building-Framing

    Inspected by Gary Pitzer

  12. Jun 4, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  13. Jun 4, 2024

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  14. Jun 4, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  15. Jun 6, 2024

    Passed: Building - Insulation

    Batts In Walls, Foam Roof

    Inspected by Gary Pitzer

  16. Jul 11, 2024

    Septic Release Inspection

    Inspected by Health Dept

  17. Sep 10, 2024

    Passed: Electrical - Permanent Power

    Gary's Tablet Was Down In Field He Called And Asked Me To Pass And Release Power - 9/10/24 Ew

    Inspected by Emaleigh Williams

  18. Sep 10, 2024

    Release to power company

    Inspected by Emaleigh Williams

  19. Oct 8, 2024

    Failed: Building - Final

    Range Need To Anchored In Rear Per Manufactures Specifications, We Also Need All The Specifications On The Commercial Range And Hood For Review

    Inspected by Gary Pitzer

  20. Oct 10, 2024

    Certificate-Release Certificate

    Inspected by Gary Pitzer

  21. Oct 10, 2024

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Gary Pitzer

Documents