Permit Details

Permit Search

Permit

Roof Replacement or Repair

260 SW LIME WAY
FORT WHITE, FL 32038

Permit #
000049179
Application #
64151
Status Completed
  1. Submitted Feb 8, 2024
  2. Issued Feb 8, 2024
  3. Expires Oct 1, 2024
  4. Completed Apr 4, 2024

Property

Parcel #
04103-011
Owner
Reeher Elizabeth M
Acres
4.98
Subdivision
Arrow Wood
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0495C
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Re roof Metal to Metal, 20sq,
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2000
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Metal
Florida Product Approval Number
FL5211.3-R8
Product Manufacturer
Millennium Metals
Product Description
M-seam panel
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Mineral Surface
Second Roof Pitch (if applicable)
4:12 or Greater
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Robert Russell

    Triton Roofing & Restoration

    License
    CCC1330549
    Title
    Cert. Roofing
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Apr 4, 2024

    Passed: Engineering - Access Road/Driveway Right-of-Way Integrity Inspection

    Dirt Driveway

    Inspected by Anthony Aslan

  2. Apr 4, 2024

    Passed: Re-Roof - Final

    No In Progress, In Future Need In Progress

    Inspected by Anthony Aslan