Permit Details

Permit Search

Permit

New Residential Construction

196 FOREST GLEN.
LAKE CITY, FL. 32025

Permit #
000049178
Application #
63593
Status Completed
  1. Submitted Dec 13, 2023
  2. Issued Feb 8, 2024
  3. Expires Mar 24, 2025
  4. Completed Oct 14, 2024

Property

Parcel #
09116-138
Owner
Nowery John M, Nowery Darlene J
Acres
4.41
Subdivision
Hills At Rose Creek Phase 3
Zoning
PRRD
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0384D
This is the construction of a
Single Family Dwelling
Setbacks Front
50'
Setback Side 1
25'
Setback Side 2
200'
Setbacks Rear
200'
Stories
1
Heated Area (Sqft)
2078
Total Area (Sqft)
3259
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
residential
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0057
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - On Hold-Incomplete
  4. Point Review - On Hold-Incomplete
  5. Point Review - Printed-Online Application
  6. Point Review - Reviewed
  7. Plan Review - Documents Required
  8. Plan Review - Plumbing Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Building Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Reviewed
  14. Final Review - Processing
  15. Final Review - Payment Needed
  16. Permit Issued

Contractors

  • Dustin Busscher

    Busscher Enterprises Llc Dba Jbc Builders

    License
    CBC1263910
    Title
    Cert. Building
    Role
    Contractor

Inspections

  1. Mar 1, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  2. Mar 1, 2024

    Passed: Building - Footer

    Inspected by Gary Pitzer

  3. Mar 6, 2024

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  4. Mar 6, 2024

    Release to power company

    Inspected by Gary Pitzer

  5. Mar 26, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dsv Piping And Water Lines Under Preasurer

    Inspected by Gary Pitzer

  6. Apr 4, 2024

    Electrical -1st Underground Rough–In

    In Slab Floor Boxes And Conduits

    Inspected by Gary Pitzer

  7. Apr 4, 2024

    Passed: Building - Slab

    Using Fiber In Concrete, Plastic And Taped

    Inspected by Gary Pitzer

  8. May 3, 2024

    Passed: Building - Roof Decking

    Back 1/3 Of Roof Only, Contractor To Call In The Completed Portion Later Date With No Cover

    Inspected by Gary Pitzer

  9. May 3, 2024

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  10. May 16, 2024

    Failed: Building - Roof Decking

    Still Working On Sheathing

    Inspected by Gary Pitzer

  11. May 16, 2024

    Failed: Building - Ext Strapping/Wall Sheathing

    Inspected by Gary Pitzer

  12. May 21, 2024

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  13. May 21, 2024

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  14. May 24, 2024

    Passed: Building - Rated Assembly Fastening

    Windows Screwed And Caulked

    Inspected by Gary Pitzer

  15. Jun 13, 2024

    Passed: Building - Framing

    Inspected by Troy Crews

  16. Jun 13, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  17. Jun 13, 2024

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  18. Jun 13, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    107 Psi On Water Lines

    Inspected by Troy Crews

  19. Jun 21, 2024

    Passed: Building - Insulation

    Inspected by Troy Crews

  20. Aug 15, 2024

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  21. Aug 15, 2024

    Release to power company

    Inspected by Gary Pitzer

  22. Aug 21, 2024

    Septic Release Inspection

    Inspected by Health Dept

  23. Sep 23, 2024

    Cancelled: Electrical - Permanent Power

    Inspected by Gary Pitzer

  24. Sep 23, 2024

    Cancelled: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  25. Sep 23, 2024

    Failed: Building - Final

    Not Ready, Lots Of Work Still In Progress, Reschedule When Complete

    Inspected by Gary Pitzer

  26. Sep 25, 2024

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Gary Pitzer

  27. Oct 14, 2024

    Certificate-Release Certificate

    Rec'd Docs

    Inspected by Gary Pitzer

Documents