| Septic Release Inspection |
|
Health Dept |
1/19/2024 |
| Electrical -1st Underground Rough–In |
Under Slab Conduits |
Gary Pitzer |
2/20/2024 |
| Passed: Electrical - Pool/Deck Bonding |
|
Gary Pitzer |
2/20/2024 |
| Passed: Swimming Pool - Pool Deck/Piping Pressure |
|
Gary Pitzer |
2/20/2024 |
| Passed: Swimming Pool - Pool Footer |
2#5and Bonded |
Gary Pitzer |
2/20/2024 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
2/20/2024 |
| Passed: Swimming Pool - Pool Steel and Ground |
|
Gary Pitzer |
2/20/2024 |
| Passed: Swimming Pool - Pool Safety and Final |
Pool Only |
Gary Pitzer |
8/27/2024 |