Permit Details

Permit Search

Permit

New Residential Construction

668 SW MANDIBA DR
LAKE CITY, FL 32024

Permit #
000049114
Application #
63505
Status Completed
  1. Submitted Dec 8, 2023
  2. Issued Jan 30, 2024
  3. Expires Apr 26, 2025
  4. Completed Oct 30, 2024

Property

Parcel #
09280-121
Owner
Garcia Christopher Anthony, Scott-garcia Mary Kay
Acres
2.26
Subdivision
Oaks Of Lake City Phase 1
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
85'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2495
Total Area (Sqft)
3734
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0819
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Documents Required
  6. Plan Review - On Hold-Incomplete
  7. Plan Review - On Hold-Incomplete
  8. Plan Review - On Hold-Incomplete
  9. Plan Review - Building Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Mechanical Approved
  12. Plan Review - Plumbing Approved
  13. Plan Review - Fuel/Gas Approved
  14. Plan Review - Reviewed
  15. Zoning Review - Reviewed
  16. Final Review - Processing
  17. Final Review - Payment Needed
  18. Permit Issued
  19. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Feb 8, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  2. Feb 8, 2024

    Passed: Building - Footer

    2#5 On Chairs

    Inspected by Gary Pitzer

  3. Feb 20, 2024

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  4. Feb 20, 2024

    Release to power company

    Inspected by Gary Pitzer

  5. Mar 11, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Gary Pitzer

  6. Mar 25, 2024

    Passed: Building - Slab

    Steel And Wire Over Plastic Taped

    Inspected by Gary Pitzer

  7. May 9, 2024

    Passed: Building - Ext Strapping/Wall Sheathing

    Building Wall Sheathing Only, Only Straps Are The Ones That Are Going To Be Hidden

    Inspected by Gary Pitzer

  8. May 9, 2024

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  9. Jun 6, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Tub Flooded Only

    Inspected by Gary Pitzer

  10. Jun 6, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  11. Jun 6, 2024

    Failed: Mechanical - Rough In

    Several Locations Thur-out Home Have Flex Ducts With Straps Choking The Ducts

    Inspected by Gary Pitzer

  12. Jun 6, 2024

    Passed: Building - Framing

    Inspected by Gary Pitzer

  13. Jun 13, 2024

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  14. Jun 25, 2024

    Passed: Building - Insulation

    Foam Walls And Attic

    Inspected by Anthony Aslan

  15. Aug 28, 2024

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  16. Aug 28, 2024

    Release to power company

    Inspected by Gary Pitzer

  17. Aug 29, 2024

    Septic Release Inspection

    Inspected by Health Dept

  18. Oct 28, 2024

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Gary Pitzer

  19. Oct 30, 2024

    Certificate-Release Certificate

    Inspected by Gary Pitzer

Documents