| Inspection |
Notes |
Performed By |
Date |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Dwv Only To Road Side Of Structurer On Clean Out, 1vent Pipe On The Opposite Side Of The Structure, Full Of Water |
Gary Pitzer |
5/3/2024 |
| Cancelled: Plumbing/Gas - 1st Underground Rough–In |
|
Gary Pitzer |
5/3/2024 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
5/10/2024 |
| Cancelled: Building - Monolithic Slab |
|
Gary Pitzer |
5/10/2024 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
5/13/2024 |
| Passed: Building - Monolithic Slab |
|
Gary Pitzer |
5/13/2024 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
6/4/2024 |
| Rescheduled 6/5/2024:Building - Slab |
|
Gary Pitzer |
6/4/2024 |
| Rescheduled 6/5/2024:Building - Footer |
Did Not Get Ready |
Gary Pitzer |
6/4/2024 |
| Passed: Building - Slab |
Porches |
Anthony Aslan |
6/5/2024 |
| Rescheduled 11/14/2024:Building - Roof Decking |
|
Troy Crews |
11/14/2024 |
| Passed: Building - Roof Decking |
Partial On Perimeter Left Back And Right Side, 2 Rows |
Gary Pitzer |
11/14/2024 |
| Passed: Building - Wall Sheathing |
|
Troy Crews |
3/4/2025 |
| Passed: Plumbing/Gas - Water Pipe |
|
Gary Pitzer |
3/14/2025 |
| Passed: Building - Slab |
Bath Extension |
Gary Pitzer |
3/14/2025 |
| Failed: Building - Framing |
1. Truss Bracing Missing, 2. Girder Trusses Need Proper Stapping |
Gary Pitzer |
6/24/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
7/14/2025 |
| Passed: Building - Insulation |
Pictures Sent In |
Troy Crews |
10/1/2025 |
| Passed: Building - Framing |
Picture Sent Of Girder Strap |
Troy Crews |
10/2/2025 |
| Passed: Electrical - 2nd Rough-In |
Pictures Sent |
Troy Crews |
10/2/2025 |
| Passed: Mechanical - Rough In |
Pictures Sent |
Troy Crews |
10/2/2025 |