| Application #: | 63825 |
| Permit #: |
000049045 |
| Related Permit: |
|
| Submitted: | Tuesday, January 9, 2024 |
| Issued: | Thursday, January 18, 2024 |
| Expires: | Friday, February 23, 2024 |
| Completed: | Friday, February 23, 2024 |
| Status: |
Completed |
| Septic Release? |
N/A |
Notes
PICS & AFFIDAVIT REC'D
| Elevation regulation |
Subdivision Plat |
| Finished floor requirement |
86' |
| Requirement needed |
By Nailing Inspection |
| Document needed is |
a Surveyor letter giving the Finished Floor Elevation |
| Document receieved |
Yes |
| Fema map number |
12023C0382D |
| This is the construction of a |
Single Family Dwelling |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setback Side 2 |
25' |
| Setbacks Rear |
200' PRRD-BUFFER ZONE |
| Stories |
1 |
| Heated Area (Sqft) |
2479 |
| Total Area (Sqft) |
3656 |
| Building Height |
20 |
| Building Code Construction Type |
V |
| Building Code Element |
B |
| Building Code Occupancy Types |
Residential |
| Occupancy Use Title |
single family dwelling |
| Building Code Edition |
2020 Florida Building Code 7th Edition and 2017 National Electrical Code |
| Septic# (00-0000) or (X00-000) |
21-0568 |
| Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) |
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified. |
| 1/9/2024 |
Application pending. |
| 1/9/2024 |
Application submitted by applicant. |
| 1/9/2024 |
Final Review - Corrections Needed |
| 1/16/2024 |
Final Review - Payment Needed |
| 1/18/2024 |
Permit Issued |
| Name / Business |
License |
Title |
Role |
Lewis G Walker Lewis Walker Roofing Inc
|
CCC1333551 |
Cert. Roofing |
Contractor |
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
This Project Has A Remodel Permit #49010, Need Engineer To Review.
dry In Project And Roof To Protect Structure.
|
Anthony Aslan |
1/22/2024 |
| Failed: Re-Roof - Final |
Need Architect Or Engineer Report On Gable Truss As Discussed. |
Troy Crews |
1/25/2024 |
| Rescheduled 2/23/2024:Re-Roof - Final |
|
Emaleigh Williams |
2/23/2024 |
| Passed: Re-Roof - Final |
|
Troy Crews |
2/23/2024 |