Permit Details

Permit Search

Permit

New Residential Construction

273 SW HERMITAGE GLN
HIGH SPRINGS, FL 32643

Permit #
000049012
Application #
63419
Status Completed
  1. Submitted Nov 22, 2023
  2. Issued Jan 12, 2024
  3. Expires Sep 29, 2024
  4. Completed Mar 28, 2025

Property

Parcel #
10039-105
Owner
Fischer Jeffrey B, Fischer Beth Ann
Acres
5.00
Subdivision
Hermitage
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
TRUSS ENGINEERING-- SUBMITTED BY NAILING One foot above the road
Requirement needed
By Nailing Inspection
Document receieved
No
Fema map number
12023C0551C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
2
Heated Area (Sqft)
3770
Total Area (Sqft)
6667
Building Height
26
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0878
If Other, explain the use of the structure.
Construction of SFR with Mother In Law Suite - One Building with 2 kitchens
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - On Hold-Incomplete
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Plan Review - Private Provider
  7. Zoning Review - Reviewed
  8. Final Review - Documents Required
  9. Final Review - Reviewed
  10. Final Review - Payment Needed
  11. Final Review - Payment Needed
  12. Permit Issued

Contractors

This is an owner-builder project.

Inspections

  1. Jan 25, 2024

    Passed: Building - Footer

    Passed By Sgreen

    Inspected by Private Provider

  2. Jan 25, 2024

    Passed: Engineering - Setbacks

    Passed By Sgreen

    Inspected by Private Provider

  3. Feb 9, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Passed By D Hulst

    Inspected by Private Provider

  4. Feb 13, 2024

    Passed: Building - Slab

    Slab Passed By Sgreen

    Inspected by Private Provider

  5. Mar 25, 2024

    Passed: Building - Wall Sheathing

    Wall And Roof Sheathing Passed By Dhulst

    Inspected by Private Provider

  6. Apr 2, 2024

    Passed: Building - Roof Decking

    Roof Valley, Eave Drip Passed By Sgreen

    Inspected by Private Provider

  7. Apr 2, 2024

    Passed: Building - Wall Sheathing

    Housewrap Passed By Sgreen

    Inspected by Private Provider

  8. Apr 17, 2024

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Hvac Not Installed, Plumbing Not Complete, No Pressure On Plumbing Supply, Foam All Penetrations Through Top Plate, Floor Trusses Need Tie Downs Per Plans, Plans Show Through Strapping From Bonus Room Wall To Floor Trusses But Does Not Specify Spacing, Need Approved Plans And Truss Packet To Complete Inspection, Insulation Spray Foam On Roof Deck, Do Not Continue Insulation Until Framing And Meps Pass--- Failed By Seth Green

    Inspected by Private Provider

  9. Apr 17, 2024

    Failed: Electrical - 1st Underground Rough–In

    Hvac Not Installed, Plumbing Not Complete, No Pressure On Plumbing Supply, Foam All Penetrations Through Top Plate, Floor Trusses Need Tie Downs Per Plans, Plans Show Through Strapping From Bonus Room Wall To Floor Trusses But Does Not Specify Spacing, Need Approved Plans And Truss Packet To Complete Inspection, Insulation Spray Foam On Roof Deck, Do Not Continue Insulation Until Framing And Meps Pass--- Failed By Seth Green

    Inspected by Private Provider

  10. Apr 17, 2024

    Failed: Building - Framing

    Hvac Not Installed, Plumbing Not Complete, No Pressure On Plumbing Supply, Foam All Penetrations Through Top Plate, Floor Trusses Need Tie Downs Per Plans, Plans Show Through Strapping From Bonus Room Wall To Floor Trusses But Does Not Specify Spacing, Need Approved Plans And Truss Packet To Complete Inspection, Insulation Spray Foam On Roof Deck, Do Not Continue Insulation Until Framing And Meps Pass--- Failed By Seth Green

    Inspected by Private Provider

  11. Sep 16, 2024

    Building-Framing

    Structural Framing Passed By Aholcombe

    Inspected by Private Provider

  12. Sep 16, 2024

    Mechanical-Rough In

    Mechanical Rough Passed By Aholcombe

    Inspected by Private Provider

  13. Sep 16, 2024

    Electrical -1st Underground Rough–In

    Electrical Rough Passed By Aholcombe

    Inspected by Private Provider

  14. Sep 16, 2024

    Plumbing/Gas-1st Underground Rough–In

    Plumbing Rough Passed By Aholcombe

    Inspected by Private Provider

  15. Oct 3, 2024

    Building-Insulation

    Insulation Passed By Aholcombe

    Inspected by Private Provider

  16. Nov 4, 2024

    Building-Strapping

    Drywall Attachment Passed By Aholcombe

    Inspected by Private Provider

  17. Jan 24, 2025

    Septic Release Inspection

    Inspected by Health Dept

  18. Mar 20, 2025

    Mechanical-Rough In

    Mechanical Final Passed By Aholcombe

    Inspected by Private Provider

  19. Mar 20, 2025

    Electrical -2nd Rough-In

    Electrical Final Passed By Aholcombe

    Inspected by Private Provider

  20. Mar 20, 2025

    Building-Final

    Building Final Passed By Aholcombe

    Inspected by Private Provider

  21. Mar 20, 2025

    Electrical -Permanent Power

    Electrical Final Passed By Aholcombe

    Inspected by Private Provider

  22. Mar 25, 2025

    Release to power company

    Inspected by Melissa Garber

  23. Mar 28, 2025

    Certificate-Release Certificate

    Inspected by Private Provider

Documents