Permit Details

Permit Search

Permit

New Residential Construction

205 SW GOVERNORS GLN
LAKE CITY, FL 32024

Permit #
000049008
Application #
63420
Status Completed
  1. Submitted Nov 21, 2023
  2. Issued Jan 12, 2024
  3. Expires Jun 3, 2025
  4. Completed Dec 10, 2024

Property

Parcel #
03406-206
Owner
Nickelson Dale, Nickelson Karla
Acres
2.51
Subdivision
Rose Creek Plantation Phase 1
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0383D
This is the construction of a
Accessory Dwelling
Heated Area (Sqft)
1704
Total Area (Sqft)
1782
Stories
2
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
detached garage
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Septic# (00-0000) or (X00-000)
24-0014
Service Amps
100
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Application Converted
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Plan Review - Corrections Needed
  7. Plan Review - Documents Required
  8. Plan Review - Building Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Mechanical Approved
  11. Plan Review - Plumbing Approved
  12. Plan Review - Fuel/Gas Approved
  13. Plan Review - Reviewed
  14. Zoning Review - Corrections Needed
  15. Zoning Review - Reviewed
  16. Final Review - Processing
  17. Final Review - Reviewed
  18. Final Review - Payment Needed
  19. Final Review - Payment Needed
  20. Permit Issued

Contractors

  • Aaron Nickelson

    Aaron Marc Llc

    License
    CBC1258040
    Title
    Building Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • George N Degler Jr

    A Proud Plumber Llc

    License
    CFC1427133
    Title
    Plumbing Contractor
    Role
    Subcontractor

    County License & State License Expired.

  • Benjamin L Sparks

    Line Electric Company Llc

    License
    EC13009101
    Title
    Cert. Electrical
    Role
    Subcontractor

    County License & State License Expired.

  • Stephen M Brisbois

    Epic Ac Service (dba) Central Home Heating & Air Llc

    License
    CAC1819412
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Jan 16, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Jan 16, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    One Bathrm Set Up, And Water Under Slab

    Inspected by Gary Pitzer

  3. Jan 18, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  4. Jan 18, 2024

    Passed: Building - Monolithic Slab

    Rebarin Footing,wire In Floor,plastic And Tape

    Inspected by Gary Pitzer

  5. Feb 21, 2024

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  6. Feb 21, 2024

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  7. Mar 7, 2024

    Passed: Building - Framing

    Inspected by Gary Pitzer

  8. Mar 7, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  9. Mar 7, 2024

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  10. Apr 1, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  11. Apr 1, 2024

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Gary Pitzer

  12. Apr 9, 2024

    Passed: Building - Insulation

    Foam And Batts

    Inspected by Gary Pitzer

  13. Dec 5, 2024

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Gary Pitzer

  14. Dec 10, 2024

    Certificate-Release Certificate

    Inspected by Gary Pitzer

Documents