10/3/2023
|
Application pending.
|
10/4/2023
|
Application submitted by applicant.
|
10/9/2023
|
Point Review - On Hold-Incomplete
NEEDED
* SEALED STRUCTURAL PLANS
|
10/19/2023
|
Point Review - Email Sent
NEEDED
* SEALED STRUCTURAL PLANS
|
10/19/2023
|
Point Review - On Hold-Incomplete
NEEDED
* SEALED STRUCTURAL PLANS
|
11/9/2023
|
Point Review - Printed-Online Application
|
11/21/2023
|
Plan Review - Corrections Needed
need:
**manual j & energy forms sqft dosen't match plans.
|
11/27/2023
|
Plan Review - On Hold-Incomplete
NEED
** MANUAL J & ENERGY FORM SQFT DOSEN'T MATCH PLANS
|
12/6/2023
|
Plan Review - On Hold-Incomplete
NEED
**new MANUAL J & ENERGY FORM SQFT DOSEN'T MATCH PLANS
|
12/7/2023
|
Plan Review - Corrections Needed
NEED
**ENERGY FORM not seer 2 compliant
|
12/8/2023
|
Plan Review - Building Approved
|
12/8/2023
|
Plan Review - Electrical Approved
|
12/8/2023
|
Plan Review - Mechanical Approved
|
12/8/2023
|
Plan Review - Plumbing Approved
|
12/8/2023
|
Plan Review - Fuel/Gas Approved
|
12/8/2023
|
Plan Review - Reviewed
|
12/18/2023
|
Zoning Review - Corrections Needed
LIDAR INDICATES FINISHED FLOOR WOULD NEED TO BE 4 FOOT ABOVE EXISTING GRADE
YOU MAY WANT TO GET ENGINEER LETTER FOR ESTABLISHHING FLOOR HEIGHT
|
12/19/2023
|
Zoning Review - Reviewed
|
12/19/2023
|
Final Review - Reviewed
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
12/19/2023
|
Final Review - Contact the Building Dept
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
12/19/2023
|
Final Review - Reviewed
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
12/19/2023
|
Final Review - Payment Needed
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
12/29/2023
|
Final Review - Payment Needed
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
1/2/2024
|
Permit Issued
Permit #000048935 created and approved.
|