| Septic Release Inspection |
|
Health Dept |
12/13/2023 |
| Passed: Swimming Pool - Pool Steel and Ground |
|
Gary Pitzer |
2/9/2024 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
2/9/2024 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
4/17/2024 |
| Passed: Swimming Pool - Pool Footer |
|
Anthony Aslan |
4/17/2024 |
| Failed: Swimming Pool - Pool Footer |
No Rebar In Vertical Columns And No Bonding In Top Lintel. |
Anthony Aslan |
5/28/2024 |
| Cancelled: Engineering - Setbacks |
|
Anthony Aslan |
5/28/2024 |
| Passed: Swimming Pool - Pool Footer |
Steel Installed |
Troy Crews |
6/4/2024 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
6/4/2024 |
| Passed: Electrical - Pool/Deck Bonding |
|
Anthony Aslan |
6/11/2024 |
| Passed: Building - Spot Check |
|
Troy Crews |
12/6/2024 |
| Cancelled: Building - Spot Check |
|
Troy Crews |
12/6/2024 |